State Industries SHE50-100PE Electrical Requirements, Service Notes Electrical, Outlet Tester

Page 9

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

ELECTRICAL REQUIREMENTS

The water heater covered by this Service Manual must be grounded in accordance with the local codes, or in the absence of local codes: the National Electrical Code (NFPA 70) or the Canadian Electrical Code (C22.1).

The water heater covered by this Service Manual requires a 120 VAC 1Ø (single phase) power supply. It is factory equipped with a standard 3 prong appliance cord that plugs into a standard 120 VAC wall outlet. 5.2 FLA (full load amps) approximate.

As shown in the illustration below there should be 120 VAC present between the power supply hot and ground wires. 120 VAC should also present between the hot and neutral wires. There should be 0 VAC present between the neutral and ground wires.

Correct wiring for a standard 120 VAC wall outlet is also shown in the Illustration below. Note the orientation of the ground connect is at the bottom. Reversed polarity is when the hot and neutral wires are connected opposite from what is shown here.

Service Notes - Electrical

This water heater is a polarity sensitive appliance and will not operate if the power supply polarity is reversed. If the polarity of the power supply is reversed the water heater’s control system will declare a fault condition and display “AC Reversed” on the UIM display.

The water heater’s burner must be grounded for flame sensing current to be established and verify ignition. If the burner is not grounded the water heater’s control system will declare a fault condition and display “Ignition Failure” on the UIM display after 3 failed ignition trials.

Also shown is an outlet tester that will quickly determine if the plug is wired correctly. These testers will also diagnose reversed polarity, open ground and open neutral wire problems. Outlet testers are inexpensive and simple to use. They are available at most hardware stores and home centers.

120 VAC 1Ø Power Supply

HOT NEUTRAL GROUND

120 volts

 

 

 

 

0 volts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 volts

Correctly Wired Outlet

120 VAC 1Ø Wall Outlet

Neutral

 

 

 

 

 

 

Hot

Ground

Outlet Tester

Technical Literature Department

8 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Image 9
Contents Service Handbook Ultra High Efficiency Power VENT/POWER Direct Vent Qualifications Qualified Service Agent Service WarningImportant Service Reminder Tools Required Thermal Expansion Closed Water SystemsContaminated AIR AIR RequirementsMaximum Equivalent Length Requirements VentingPipe Size Requirements Service Notes VentingMaximum Elbow Requirements Number Maximum Pipe Elbows Length Feet MetersVAC 1Ø Power Supply Service Notes ElectricalCorrectly Wired Outlet Electrical RequirementsInternal View HOW IT WorksBlower Service Notes BlowerBurner Service Notes Burner Flame SensorOn Next Burner & Blower RemovalBurner/Blower Removal Service Notes Blower Flange & Blower Adapter GasketsBlower VenturiGAS Valve Gas Valve RemovalGasket Orifice Service Notes Checking Gas Pressures GAS Pressure TestingService Notes Gas Pressure Adjustment GAS PressuresGas Pressures Normal State Activated State AIR Pressure SwitchesBlower Prover Switch Blocked Intake SwitchBlocked Exhaust Switch Blower Prover Failure AIR Pressure Switch OperationAIR Pressure Switch Testing Normal State TestOperational State Test Air Pressure Switch Parameters Pressure TestBlower Prover Blocked Intake Blocked Exhaust Page Flame Sensing Test Measuring Flame Sensing CurrentFlame Sensor Igniter Current Test Service Notes Hot Surface IgnitersIntroduction Control System FeaturesUIM Service Notes Button Pad Ribbon CableDiscreet Menu Contact Information Commercial & Residential Product DifferencesDesktop Screen Service Note Sequence of Operation DisplayStatus Icon Description Status IconsState Description Operational States ModesAction Display Operating SET Point AdjustmentControl System Menus ECO CCB Service Notes CCB ReplacementSocket Identification J10 J13 J15 J11 J16J1 Socket Transformer J3 Socket 120 VAC Power SupplyJ2 Socket 120 VAC To Blower PIN # DescriptionExt Use Yes Input Type Tstat Open RetryService Notes Polarity & Ground Wiring DiagramYES Sequence of OperationImportant Service Reminder Resetting the control systemRough Starting Rough Operation Note Heater Status MenuUIM Display Is Blank Control System UnresponsiveUIM is Inoperable Displayed Message CHECK/REPAIR CONDITION/INDICATESAC Reversed Fault MessagesUpper Probe Short Flame Probe ShortEnergy Cut Out ECO Flame Detect ErrorBlocked Inlet Blocked Exhaust Vent Perform ALL These Tests with Power Blower Prover OpenTurned on and a Call for Heat Active Low Igniter Current Rough Starting Rough Operation Note Ignition FailureCheck for 24 VAC to the Gas Valve solenoid coil Communication Failure Gas Valve FailureTennessee Waltz Parkway Ashland City, TN