START-UP CHECKLIST FOR 30RA LIQUID CHILLER
(Remove and use for Job File)
I.Project Information
JOB NAME ______________________________________________________________________________
ADDRESS _______________________________________________________________________________
CITY ____________________________________________ STATE _______________ ZIP______________
INSTALLING CONTRACTOR ________________________________________________________________
SALES OFFICE ___________________________________________________________________________
Design Information
CAPACITY
CEAT
EWT
LWT
FLUID TYPE FLOW RATE
P.D.
UNIT MODEL ______________________________ SERIAL ________________________________
II. Preliminary Equipment Check
IS THERE ANY PHYSICAL DAMAGE?YES NO
DESCRIPTION ____________________________________________________________________________
________________________________________________________________________________________
1. UNIT IS INSTALLED LEVEL AS PER THE INSTALLATION INSTRUCTIONS. | YES | NO |
2. POWER SUPPLY AGREES WITH THE UNIT NAMEPLATE. | YES | NO |
3. ELECTRICAL POWER WIRING IS INSTALLED PROPERLY. | YES | NO |
4. UNIT IS PROPERLY GROUNDED. | YES | NO |
5. ELECTRICAL CIRCUIT PROTECTION HAS BEEN SIZED AND INSTALLED PROPERLY. | YES | NO |
6. ALL TERMINALS ARE TIGHT. | YES | NO |
7. ALL PLUG ASSEMBLIES ARE TIGHT. | YES | NO |
8. ALL CABLES AND THERMISTORS HAVE BEEN INSPECTED FOR CROSSED WIRES. | YES | NO |
9. ALL THERMISTORS ARE FULLY INSERTED INTO WELLS. | YES | NO |
Chilled Water System Check |
|
|
1. ALL CHILLED WATER VALVES ARE OPEN. | YES | NO |
2. ALL PIPING IS CONNECTED PROPERLY. | YES | NO |
3. ALL AIR HAS BEEN PURGED FROM THE SYSTEM. | YES | NO |
4. CHILLED WATER PUMP IS OPERATING WITH THE CORRECT ROTATION. | YES | NO |
| Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations. | |||||||
Book | 2 | PC 903 | Catalog No. | Printed in U.S.A. | Form | Pg | Replaces: | |
Tab | 5c |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|