Smart Distribution Panel with ATS

Front view, door open

Remove the dead front to

 

obtain access to the panel

 

board for maintenance and

wiring.

 

The Source 1 motorized

switch (see “Motorized

 

switches” on page 15)

 

controls operation of the

Source 1 input switch.

 

The automatic operation

control panel is used to set

the generator to automatic

operation or, alternatively, to

 

remove the generator from

 

automatic operation (see

 

“Automatic operation control

 

panel” on page 16).

The Source 1 lamp lights

green when the Source 1

 

switch is ON (closed).

The display interface

 

provides a local interface for

viewing status data,

 

configuring settings, and

pg0010c

operating the ATS. The

 

display interface has an LCD,

 

a five-button panel,

 

basic status lights, and a beeper (see “Display Interface” on page 29 for detailed information about the contents and operation of each screen).

The sub-feed output breakers provide power to equipment in the data center (see page 68 for detailed information about installing these breakers).

The Source 2 lamp lights green when the Source 2 switch is ON (closed).

The Source 2 motorized switch (see “Motorized switches” on page 15) controls operation of the Source 2 input switch.

Use the latches to open the dead front.

12

InfraStruXure Power Generation System

Page 22
Image 22
American Power Conversion 250 A manual Front view, door open,  The automatic operation Control panel is used to set