Testing

View Test Log

Run/View Test

Test Schedule

Test Duration

View Test Log

Displays all logged test results in a scrolling list. For each item, the screen provides the Gen Start test and the Load Test results with a date and time stamp of when the test occurred.

Run/View Test

Use this menu to run a test now, or to view a test that is in progress.

Engine Start Test If a test is in progress, the screen displays Test Progress and the time remaining in the test. If you want to stop the test, select the ABORT NOW? item on this screen and then press ENTER.

If you want to run a start test now, select Run Test Now from the confirmation screen and then press ENTER. The test will run based on the parameters set on the Test Duration menu. If you do not want to run a start test now, choose No from the confirmation screen and then press ENTER.

System Load Test If a test is in progress, the screen displays Test Progress and the time remaining in the test. If you want to stop the test, select the ABORT NOW? item on this screen and then press ENTER.

If you want to run a load test now, select Run Test Now from the confirmation screen and then press ENTER. The test will run based on the parameters set on the Test Duration menu. If you do not want to run a load test now, choose No from the confirmation screen and then press ENTER.

InfraStruXure Power Generation System

39

Page 49
Image 49
American Power Conversion 250 A manual Testing, View Test Log, Run/View Test