Emergency Manual Operation

5. Turn the Source 2 switch ON ()

a. Set the selector on the Source 2 switch to Manual.

The operating lever will swing out when the selector is set to Manual.

b. Turn the Source 2 switch clockwise to ON (). Use the operating lever key for easier operation.

c.Close the operating levers on both the Source 1 and Source 2 switches, and then set the selectors back to Auto to lock the switches in place.

6.Ensure the generator is powering the load. The downstream UPS should not be using battery power and the load equipment should be operating.

7.Check the control panel of the generator for visible alarms indicating possible problems. Refer to the troubleshooting section of this manual, if necessary.

24

InfraStruXure Power Generation System

Page 34
Image 34
American Power Conversion 250 A manual Emergency Manual Operation