Selector switch, on motorized switch, 15

Service, obtaining. See back cover Single-pole label, 18

SNMP interface, 49

SNMP, for accessing the ATS, 58

Source 1 control transformer, location of, 13

Source 1 current transformer, location of, 14

Source 1 fuse block, location of, 13

Source 1 input switch, location of, 14

Source 1 lamp, location of, 12

Source 1 motorized switch, location of, 12

Source 2

if it is a utility mains connection, 81

if it is not an APC ISX generator, 82

Source 2 control transformer, location of, 14

Source 2 fuse block, location of, 14

Source 2 input switch, location of, 13

Source 2 lamp, location of, 12

Source 2 motorized switch, location of, 12

Source label, 18 Specifications, 77-79

SSH, for accessing the control console, 58

Stats screen, 42

Sub-feed breakers, location of, 12 System ID menu, 47

System load test, 39

T

TCP/IP configuration methods, 52

Telnet, for accessing the control console, 58

Temperature, for operation, 3 Test log, how to view, 39

Testing

configuring duration of, 40 how a test occurs, 41

how to initiate or view a test, 39 of the EPO switch, 63 schedule, 3, 40

Testing screen, 3941 Three-pole breaker label, 18

Tools, for circuit breaker installation, 73

Total power off, 3, 2728

Transfer blocking, configuring conditions for, 36

Transfer setup, 8

Transfers, open and closed, 8 Trip test button, 15 Tripped LED, 17

U

Updates, to this manual, i User connection plate

connecting the EPO switch, 64 detailed description, 16 location of, 11

User contacts port, location of, 17 Utility power, condition of, 33

W

Warnings, 23

for emergency manual operation, 22

for Emergency Power Off, 66 for installation, 3

for motorized switches, 15 Web interface, 49, 57

Wheel extensions, on the panel board, 13

Wire size, how to determine, 2 Wiring specifications, 78 Withdrawal prevention lock, 15

InfraStruXure Power Generation System

85

Page 95
Image 95
American Power Conversion 250 A manual InfraStruXure Power Generation System