Overview

30 InfraStruXure Power Generation System
Top-level status screens

After system start-up, a brief introduction screen is displayed and then the display interface scrolls

automatically and continuously through five screens of basic status information. Press the Up or

Down arrows to interrupt automatic scrolling and view a specific status screen.

If you have scheduled one or more tests, the display interface shows the scheduled test screen (below)

each time a self-test commences. To cancel an ongoing self-test, press ENTER when the selector arrow
rests on the ABORT NOW? option.
Top-level menu screen

Press ENTER to open any of the following top-level menu screens:

Source: S1-Utility
S1: Ok
Fuel: xxx%
Runtime:1 day 12hr
Volts-Out
Load Current:
L1: 000
L2: 000
L3: 000
Neut:
000
No Active Alarms
System Date/Time:
Jun-24 2004 07:58
S2: OFF
Volts-Sx
L1-2: xxx
L2-3: xxx
L3-1: xxx
L1-2: xxx
L2-3: xxx
L3-1: xxx
Total Output Loading
kW: 000
kVA: 000
Freq: 000
PF: 000
%LD: xxx
Scheduled test will
start in xxx sec.
ABORT NOW?
Note

If the display interface is inactive for the time specified in the Time-out setting, it will

revert to the initial basic monitoring screens.

For descriptions of the top-level menu choices, see the sections devoted to each top-

level menu starting on page32.

Load-Meter
ATS/Voltage
Generator
Testing
Stats
Alarms
Config
Help