6.Unwrap the Ribbon Supply Roll and prepare to place it into the Supply Holder area of the print head module. Make sure that the Ribbon is coming off the Top of the Ribbon Roll and to the front of the printer (Ribbon should be a wound-in type). See Supply Ribbon Installation figure below.

7.Insert the Ribbon Supply Core into the Ribbon Supply Area by first compressing the right side spring and snapping the left side of supply core into the left side of the notched wheel. Make sure that the slots in left side of the core mate with the notches on the left side ribbon drive wheel.

Ribbon Supply Roll

Right Side Spring Holder

Ribbon Take-Up Roll

Figure 12 – Supply Ribbon Installation

Fastmark 600 Series User's Guide

21

Page 21
Image 21
AMT Datasouth 600 manual Supply Ribbon Installation