2-4
Cisco Integrated Services Router Hardware Installation Guide
OL-27407-01
Chapter2 Installing the Router
Installing the Cisco 810 ISR
Figure2-2 6-32 Screws
Step3 Connect the supplied plenum rated Cat5 cable to the GE0 port on the PoE+ splitter.
Step4 Connect the Cat5 cable from your PoE+ source to the PoE+ in port on the PoE+ splitter.
Step5 Place the power cord lock onto the power cord behind the connector overmold as shown in Figure2-3.
Slide the power cord lock forward so that it captures the overmold and is fully seated.
Figure2-3 Placement of the Power Cord Lock onto the Power Cord
285668
1
23
4
16-32 screws 3To PoE + pow er so urce
2Power cable with power cord lock installed 4GE CAT5 cable
345076
1
2
1Power cord connector
2Power cord lock