PREPARING FOR INSTALLATION

PREPARING FOR INSTALLATION

Plan the location for the chiller and prepare the area properly.

Position the Chiller as close to the process machine as possi- ble. Place the chiller in position near the process machine so that fluid lines can be connected from the process machine to the chiller and back.

Chiller

Process machine

Alternate

locations

Make sure the area where the chiller is installed has:

A grounded power source.

Check the chiller’s serial tag for the correct amps, volt- age, phase, and cycle. All wiring should be completed by qualified personnel and comply with your region’s elec- trical codes.

Clearance for safe operation and maintenance. Make sure there is two feet clearance around the chiller for proper operation, maintenance, and servicing. After positioning, lock casters to prevent chiller from moving.

 

24 inches

24 inches

(610 mm)

(610 mm)

 

 

24 inches

 

(610 mm)

 

24 inches

 

(610 mm)

Available water source.

If installing a water-cooled unit, makes sure water source is plumbed to chiller installation location. High points in plumbing require vent valves; low points require drain valves.