Tasks to Be performed for Customer Integrated Systems

17

Grounding

17

Sub-Racks Electrical Interconnections

21

Tasks to Be Perform for All Installations

25

Grounding

25

AC Input Power Connections

28

DC Load Distribution Electrical Connections to List 21-24 DC Load Distribution Sub-Rack(s) (if

furnished)

29

Installing Battery Sub-Trays in List 91 and 92 Battery Tray(s) (if furnished)

...............................................31

External Battery Connections (if required)

33

IB2 (ACU+ Controller Interface Board) Connections (if required)

35

ACU+ Controller Ethernet Connection (if required)

36

Power and Control Sub-Rack Bulk Output Connections (if required)

40

CHAPTER 4. INSTALLING THE RECTIFIER MODULE

41

CHAPTER 5. INITIALLY STARTING THE SYSTEM

42

Initial Startup Preparation

42

Initially Starting the System

43

ACU+ Controller Initialization

44

Verifying the Configuration File

46

Changing Battery Capacity Rating in the ACU+

46

Checking Basic System Settings

47

Configuring the ACU+ Identification of Rectifiers

49

Checking the System Shutdown Circuit

50

Checking System Status

50

Final Steps

51

Reference Documents

51

REVISION RECORD

52

Page ii

Table of Contents

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 4
Image 4
Emerson 4015 installation instructions Issue AB, April 3 Spec. No Model