Instruction Manual

760008-A September 2001

Model NGA 2000 TO2

possible leakage caused by damage in shipment.

1.If not already removed from the analyzer, remove the top cover of the analyzer module and locate and remove the five mounting screws which hold the Sensor Assembly (Sensor, flowmeter, plumbing) to the module. Care should be taken not to lose the screws as they have metric threads.

2.Carefully lift out the Sensor Assem- bly. Place on a flat surface and re- move the black Sensor cover by unscrewing clockwise.

3.Refill the the Sensor per Section 4- 2a, steps 2 through 5.

4.Allow the Sensor to stand for ap- proximately 15 minutes, then check for leaks around the base of the reservoir, at seams and corners.

5.If a leak is found, drain the Sensor. Contact the factory before proceed- ing.

6.If no leaks are detected drain the Sensor, refill with one bottle of elec- trolyte. Use the entire contents of the bottle.

NOTE

Do not add water. The volumn and concentration of the bottled electrolyte is pre-measured.

4-3 LINEARIZATION

After installation of a new Sensor, it will be necessary to load the new calibration data supplied with the Sensor.

NOTE

It is not necessary to load lineariza- tion data on a new analyzer which has been filled with electrolyte. The data is pre-loaded at the factory.

The data supplied with the new Sensor and must be entered exactly as shown the the Se- nosr data sheet.

From the Main Menu

TO2

37.50 ppm

 

-- Main Menu --

Analyzer basic controls (calibration) & setup…

Analyzer and I/O expert controls & setup…

System configuration and diagnostics…

Display controls…

Time & Date:

 

14:01:45 03 November 2000

System tag:

 

 

 

 

Fisher-Rosemount

Measure

 

 

Status…

 

Channel

 

Lock…

 

MFG Data

Slect Analyzer and I/O expert controls & setup…

TO2

37.50 ppm

-- Analyzer and I/O Expert Controls and Setup --

Analyzer module controls…

System & network I/O module controls…

Analyzer module setup…

System & network I/O module setup…

(Note: Controls & setup are identical for MLT/FID)

7.Reinstall the black Sensor cover and carefully install the Sensor into the Analyzer Module.

NOTE

Do not tilt Sensor excessively as elec- trolyte may leak.

Measure

 

Channel

 

Back…

 

Select Analyzer module controls… or Ana- lyzer module setup…

4-4 Maintenance and Service

Rosemount Analytical Inc. A Division of Emerson Process Management

Page 64
Image 64
Emerson NGA 2000 TO2 Linearization, Do not tilt Sensor excessively as elec- trolyte may leak, Time & Date