Table of Contents |
|
Extreme Networks 325 W DC Power Supply | 34 |
Minimum Software Required | 35 |
LEDs | 35 |
Fuse | 36 |
Specifications | 36 |
Extreme Networks 325 W AC Power Supply | 36 |
LEDs | 37 |
Replacing AC Power Supply Cords | 37 |
Fuse | 38 |
Part 2: Installing BlackDiamond Switches and Modules |
|
Chapter 4: Site Preparation | 41 |
Planning Your Site | 41 |
Meeting Site Requirements | 42 |
Operating Environment Requirements | 42 |
Building and Electrical Codes | 42 |
Wiring Closet Considerations | 43 |
Temperature | 43 |
Humidity | 44 |
BlackDiamond Family Chassis Spacing Requirements | 44 |
Airflow Requirements | 44 |
Electrostatic Discharge | 45 |
Rack Specifications and Recommendations | 46 |
Mechanical Recommendations for the Rack | 46 |
Protective Grounding for the Rack | 46 |
Space Requirements for the Rack | 47 |
Securing the Rack | 47 |
Evaluating and Meeting Cable Requirements | 48 |
Cabling Standards | 48 |
Cable Labeling and Record Keeping | 48 |
Installing Cable | 49 |
Fiber Optic Cable | 50 |
Cable Distances | 51 |
52 | |
Radio Frequency Interference | 53 |
Meeting Power Requirements | 53 |
Power Supply Requirements | 53 |
AC Power Cable Requirements | 54 |
Replacing the Power Cable | 54 |
Uninterruptible Power Supply Requirements | 54 |
Selecting a UPS | 55 |
Calculating | 55 |
UPS Transition Time | 55 |
Applicable Industry Standards | 55 |
Chapter 5: Installing the BlackDiamond 12800 Series Chassis | 57 |
Unpacking the BlackDiamond 12804 Chassis | 58 |
60 | |
61 |
4 | BlackDiamond 12800 Series Switches Hardware Installation Guide |
|
|