Installing Power Supply Units
Installing an Extreme Networks 1200 W DC PSU
To install an Extreme Networks 1200 W DC PSU:
1Attach an
CAUTION
Be sure that the grounding point on the back of the switch is securely connected to earth ground. For information about grounding the switch, see “Grounding the BlackDiamond 12800 Series Chassis” on page 68.
2Verify that the 1200 W DC PSU is right side up, and press the yellow locking lever to the left while lifting the handle (see Figure 41).
NOTE
Do not connect the input DC cable to the DC PSU before inserting the DC PSU into the switch.
Figure 41: Locking Handle on the 1200 W DC PSU
Open
Lock
Yellow
lever
EX_130