
Power supply LED
4 Pull the power supply module straight out of the server with the handle.
5 Insert the new power supply module into the server, with the green locking lever to the left, until it locks into place, then fold the handle flat.
6 Reconnect the AC power cord for the new power supply module.
3 Fold out the handle and push the green locking lever to the right to release the power supply module from the chassis (front or back, whichever is applicable).
Locking lever | Handle |
|
www.gateway.com | 89 |