Hoshizaki SWH3-M KM-1601SAH/3, SRH/3 KM-2100SWH3, SRH/3 KM-1400SWH-M Shutdown G Control Board

Models: SRH/3 KM-1900SAH/3 SRH3 KM-2500SWH3 SRH3 KMH-2000SWH/3 SWH/3 KM-1301SAH/3 SWH3-M KM-1601SAH/3 SRH/3 KM-1400SWH-M SRH/3 KM-2100SWH3 SRH/3

1 101
Download 101 pages 53.65 Kb
Page 30
Image 30

8)Normal Harvest Cycle – Same as the initial harvest cycle. Return to step 5a) above. Note: Appliance continues to cycle until MBC is satisfied or power is switched off. The

appliance always restarts at the 1-min. fill cycle.

9)Shutdown: "G" Control Board

When the appliance is running, hold ice in contact with the thermostatic bulb. BC switch opens within 10 sec., shutting down the appliance. BC is factory set, and generally no adjustment is required. However, adjustment may be needed in some conditions, particularly at higher altitude locations. CB red K4 connector must have the jumper in place. When the jumper is in place, the green "BC CLOSED" LED remains on. If the jumper is not in place, yellow "BC OPEN" LED turns on and the icemaker turns off and remains off until the jumper is replaced in its original position. Diagnosis: See "II.D. Bin Control Check."

Legend: BC–bin control; CB–control board; Comp–compressor; CR–compressor relay; CT–control transformer; CV–check valve; FM–fan motor; FMR–fan motor remote; FS–float switch; HGV–hot gas valve; HM–headmaster (C.P.R.); HPS–high-pressure switch; LLV–liquid line valve; MC–magnetic contactor; PM–pump motor; TXV–thermostatic expansion valve; WRV–water regulating valve; WV–inlet water valve

30

Page 30
Image 30
Hoshizaki SWH3-M KM-1601SAH/3, SRH/3 KM-2100SWH3, SRH/3 KM-1400SWH-M, KM-1301SAH/3, SWH/3 Shutdown G Control Board