Prerequisites Before Placing an Order
This section will cover the prerequisites of placing an order to upgrade the system.
These include software-related items, hardware considerations, system
configuration considerations, and available services that everyone should know
before placing an order.
Youmay also need information about logical partitioning. Refer to the web site:
www.as400.ibm.com/LPAR
Version 4 Software Items
See the table on supported releases for software upgrades in the book Software
Installation, SC41-5120-05, to find what versions may be upgraded from and to. For
example, you must be at V4R4 to upgrade to V4R5 or V5R1.
The Preparing Program TemporaryFixes Required Before Installing V4R5M0
Softwaresection in the Software Installation book describes how to apply PTFs.
Other Software Related Items
vDetermine whether there are any additional software charges that areassociated
with the processor group change. Twopasses must be run on the iSeries 400
configuration program to determine these changes.
vDetermine whether there are any additional usage changes because of the
user-based pricing that is associated with the software products on the system.
vVerifywith the software service representative, or the business partner, that any
third party software that you use was tested on the software release level
ordered.
vContact the software service representative for any software considerations and
restrictions that might apply to the model upgrade.
Notes:
1. If you have tape management software, ensure that it uses support that is
available on your target system. Do the following:
a. Type DSPOBJD OBJ(QSYS/QUSTAPEX) OBJTYPE(*PGM)
b. If you receive the message Object QUSTAPEX in library QSYS type *PGM
not found, you do not have this potential problem with tape management
software.
c. If you see the Display Object Description display for the QUSTAPEX
program, press F12 (Cancel). Contact the vendor who supplies your tape
management software to determine how the vendor will provide equivalent
support for your target release.
Youmay need to order an OS/400 feature called MSE (Media and Storage
Extensions).
2. For other software related questions, see TechnicalStudio and the book Software
Installation, SC41-5120-05.
Hardware Considerations
vEnsure that a PC has been properly configured as an Operations Console.
vDetermine the prerequisite engineering changes and program temporary fixes
(PTFs) that are needed to upgrade the system.
vDetermine the attached input-output devices and the operating system.
Chapter2. Planning Your Order for Upgrading or Data Migration 9