Specifications

Site Requirements

Operator and Service Access

When fully assembled the equipment requires a minimum of 91 cm

(36 in.) on each side to allow sufficient access for normal operator maintenance and for service.

3.5 meters + .3 meters (138 in. + 12 in.)

2.2 meters + .3 meters (86 in. + 12 in.)

15A30A

.91 meters (36 in.) minimum

1.5 meters (60 in.)

2.9 meters

(114 in.)

*

Printer

Processor

.91 meters (36 in.)

 

 

minimum

.91 meters (36 in.)

minimum

.91 meters (36 in.)

minimum

4.54.metersters4(179(174in.)

*SCSI-2 connection from host here

Floor Requirements

The equipment should be installed on a smooth, hard, and level floor surface.

Carpet is not recommended.

The floor pitch should not exceed 1 inch in 5 feet.

B-2