STB-3000 Introduction / Setup Checklist

Introduction

The STB-3000 set-top box is designed to be connected to a compatible commercial display panel to create a system that can provide Pro:Centric ® functionality, as well as either RF or IP content delivery. The STB-3000 may be used with LG Commercial Hospitality TVs (LY570H, LY560H, etc.) that support Multiple Protocol Interface (MPI), or the STB-3000 may be used with LG Commercial Public Display TVs (LD450C, LT560C, etc.) or LG Commercial Monitors (M3203CCBA, M3204C, etc.) that support the TV-Link Monitor (TLM) interface. The STB-3000 may also be used with commercial non-LG TVs that support SONIFI’s Multiple Television Interface (MTI) protocol.

Setup Checklist

See also the STB-3000 Owner’s Manual for information on STB installation and hardware and cable connections.

Installation and Setup

__ Unpack the STB and all accessories. Accessories provided:

AC/DC Power Adapter

HDMI Cable

MPI/MTI Cable (proprietary cable for LG MPI or SONIFI MTI control of display panel)

TLM Cable (proprietary cable for LG TLM control of display panel)

A/V Adapter Cable

__ Obtain an LG Installer Remote for configuration purposes.

If you are using an LG display panel, the LG remote provided with the display should be sufficient. If you are not using an LG display panel and/or if you intend to use multiple STBs/displays in a single room installation environment, an LG Installer Remote dedicated to STB control is available for purchase. For additional information and/or to purchase an STB Installer Remote, contact your LG service representative. See also Reference section, “STB Installer Remote.”

__ Determine the installation location for the STB and display panel stand or mount.

__ Determine mounting and installation requirements, for example, AC power source outlet, antenna/cable service connectors, any external equipment required for system operation, all necessary cables, wires, and connectors, and any other additional required hardware, etc.

__ Install the display panel on VESA mount or stand.

Note: It may be advisable to make all cable connections before installing on VESA mount or stand.

Hardware Connections

__ Install any additional hardware as appropriate to your institution, LAN, etc.

Cable Connections

__ Make all connections to the STB jack panels, as described in this document.

Commercial Mode Setup

__ Complete appropriate procedures as described in this document for Commercial Mode operation.

6

206-4272