Index

pinout B-3 PMVision 6-2

CSU

activate or deactivate 2-1,C-2 line buildout C-2

CSU/DSU 1-1 current events C-5

D

data channels description 1-1

first channel assigned 2-3 unassigning C-3

data link connection identifier. See DLCI settings data service unit. See DSU

current events C-5 selected interval C-5

Ethernet cable B-2 connecting cable 3-4 LEDs 3-6

Ethernet activity LED location 1-3 observing 3-6 Ethernet interface B-2

location 1-4 specifications B-2

Ethernet link LED location 1-4 observing 3-6

deleting data channels C-3 demand tests C-6 destination address 5-7 DHCP settings 2-4 diagnostic messages A-4 DIP switch

boot mode 3-2 location 1-3 setting 3-2

DLCI settings 2-3,5-7,6-6 document advisory xiv documentation

MERLIN MAGIX xi PortMaster xiii

document conventions xiv domain name 5-5

DS-1 LEDs

front panel location 1-2 observing 3-4

DS-1 test jacks location 1-4,A-7 using A-5

DSU

channel assignments C-3 channel selection 2-1,C-2

Dynamic Host Connection Protocol. See DHCP settings

E

electrical shock risk ix error events

24-hour event totals C-4 clearing C-5

F

filters, on WAN port 5-7 fire risk ix

Frame Relay. See protocol, WAN port. frigid start C-9

front panel 1-2 functions, PMVision 6-4

G

gateway 2-3,5-4,6-6

H

hostname resolution 5-4 hot-swappability C-9

I

idle conditions C-8 INA module

administration 1-1 administration options C-1 basic settings 2-3,6-5 board renumbering C-8

command line interface connection 5-1 description 1-1

front panel 1-3

INA wizard connection 4-1 installation 3-1 maintenance options C-3

overview of installation and configuration 1- 4

PMVision connection 6-1 replacement C-9

Index-2

INA Module Installation and Configuration Guide

Page 72
Image 72
Lucent Technologies Network Access Module manual Index-2