CenturyStackTable® 8100ofManagedContentsHub Installation & User Guide
Introduction | 7 | |
| Unpacking the CenturyStack 8100 Managed Hub | 7 |
| Overview of the CenturyStack 8100 Managed Hub | 7 |
| Key Features | 9 |
| Front Panel Overview | 12 |
| Managed Slaves | 12 |
| LED Indication | 13 |
| Master Units | 15 |
| Rear Panel Overview | 16 |
Installation | 17 | |
| Choosing a Location | 17 |
| Stacking | 17 |
1 | Rack Mounting | 17 |
| Using Cascade Cables | 18 |
| Constructing a Management Stack | 18 |
| Position Within the Stack | 18 |
| Master Hub Role | 19 |
| Slave Hub Role | 19 |
| Hub ID | 19 |
| Segmenting Hubs | 19 |
| Connecting Devices | 19 |
| Cables | 19 |
| Workstations | 20 |
| Connecting to Ethernet Hubs or Devices | 20 |
| Connecting to Fast Ethernet Switching Hubs and Devices | 21 |
| Connecting to Other Dual Speed Hubs | 21 |