4G9 ENGINE (E–W)Intake and Exhaust Manifold

11A-6-1

6. INTAKE AND EXHAUST MANIFOLD

REMOVAL AND INSTALLATION <SOHC–CARBURETOR>

20 Nm

3

5

4

96

7

14 Nm

20 Nm

2

31 Nm

1

 

 

 

Bolt with head mark “4”

 

12 Nm

13

 

 

Bolt with head mark “7”

 

19 Nm

 

 

29 Nm

 

 

 

 

12

 

 

 

 

 

18 Nm 13 Nm

8

11

Bolt with head mark “4” 12 Nm

Bolt with head mark “7” 19 Nm

10

 

 

 

13 Nm

 

 

19 Nm

 

Removal steps

 

 

1.

Engine hanger

7.

O-ring

"BA 2. Intake manifold stay

8.

Exhaust manifold cover

3.

Intake manifold

9.

Engine hanger

4.

Intake manifold gasket

"AA 10.

Exhaust manifold bracket A

5.

Oil level gauge

"AA 11.

Exhaust manifold bracket B

6.

Oil level gauge guide

12.

Exhaust manifold

 

 

13.

Exhaust manifold gasket

EMitsubishi Motors Corporation

Mar. 2001

PWEE9502-I

Revised