4G9 ENGINE (E–W)Intake and Exhaust Manifold

11A-6-3

REMOVAL AND INSTALLATION <DOHC>

20 Nm

Bolt with head mark “4” 12 Nm Bolt with head mark “7” 19 Nm

3

1

20 Nm

4

12

11

2

29 Nm

18 Nm

31 Nm

Bolt with head mark “4”

 

12 Nm

Bolt with head mark “7”

 

19 Nm

 

 

 

 

 

 

5

8

10

6

9

 

7

14 Nm

 

19 Nm

Removal steps

 

 

1.

Engine hanger

7.

O-ring

2.

Intake manifold stay

8.

Engine hanger

3.

Intake manifold

"AA 9.

Exhaust manifold bracket A

4.

Intake manifold gasket

"AA 10.

Exhaust manifold bracket B

5.

Oil level gauge

11.

Exhaust manifold

6.

Oil level gauge guide

12.

Exhaust manifold gasket

EMitsubishi Motors Corporation

Mar. 2001

PWEE9502-I

Revised