July 2006 | Preparing for installation |
Installation checklist
The following checklist identifies the steps required to install the 201i server and peripheral devices. For more details, see Chapter 8, “Connecting peripheral devices to the 201i server.”
WARNING
Risk of personal injury and hardware failure
The power outlets used by the CallPilot server and its peripheral devices must be connected to the same ground reference as the one used by the Meridian 1 switch or Succession 1000 system with MGate cards (NTRB18CA) connected to the CallPilot server. If this requirement is not met, power transients can cause personal injury and hardware failure.
Step | Description | Check |
|
|
|
1 | Ensure that you have reviewed the “Installing CallPilot” | ❒ |
| section in the CallPilot Installation and Configuration Task |
|
| List and completed stage 1 of the “Installation checklist.” |
|
| This includes the following tasks: |
|
| Unpack the server, and ensure you have all the items you | ❒ |
| need (see page 39). |
|
| Complete the following checklists that are provided in |
|
| the CallPilot Installation and Configuration Task List: |
|
| — “CallPilot software media and documentation |
|
| checklist” |
|
| — “CallPilot server hardware checklist” |
|
| Inspect the server for any damage that might have | ❒ |
| occurred during shipping (see page 39). |
|
201i Server Hardware Installation | 35 |