Preparing for installationStandard 1.03

Step

Description

Check

 

 

 

9

Connect the 201i server and devices as follows:

 

 

„ Connect the monitor, keyboard, and mouse to the 201i

 

server faceplate (see page 140).

 

 

„ Connect the CD-ROM and tape drives to the intermediate

 

SCSI cable (see page 142).

 

 

„ Connect the multi I/O cable to the ELAN and CLAN

 

network hubs (see page 151).

 

 

Note: If more than 3 m (10 ft) of multi I/O cable is

 

 

required, use the supplied RJ-45 female-to-female

 

 

gender change jacks to attach additional cable. Up to

 

 

76.2 m (250 ft) of cable length is supported.

 

 

„ Connect the modem to the multi I/O cable (maximum

 

length 15 m (50 ft) (see page 154).

 

 

„ Connect the power cords for all devices, and then power

 

them up.

 

 

 

 

10

Complete the installation of the 201i server as follows:

 

„ Connect the intermediate SCSI cable to the 201i server

 

 

faceplate.

 

 

„ Close the lock latches on the 201i server.

 

 

„ Boot the 201i server to the operating system.

 

 

See page 157.

 

 

 

 

11

Continue with the CallPilot <switch model> and CallPilot

 

Server Configuration guide for your switch and server.

 

 

 

 

38

CallPilot

Page 38
Image 38
Nortel Networks CalPilot 4.0 manual Continue with the CallPilot switch model and CallPilot