July 2006 | Installing the 201i server in an Option 11C or Option 11C Mini |
The following diagram shows how to secure the multi I/O cable connection:
Velcro |
|
fastening | |
strap | A |
Pull to |
|
tighten the | |
strap |
|
| B |
| C |
| G101592 |
3Attach the multi I/O cable drain wire to a screw on the cabinet. See the diagram in step 4.
4Connect the power cord to the Option 11C Mini cabinet.
201i Server Hardware Installation | 91 |