Figure 5 Back view of Sun Fire V210 server

Figure 6 Sun Fire V210 server cabling to layer-2 switch

Note 1: Net 0 and Net 1 are for redundancy. It is preferable that each Ethernet port get cabled to a different layer-2 switch, if available, for maximum redundancy.

Note 2: The two Ethernet switches are physically linked together through either cascade modules or Ethernet links.

2Plug in the power cords at the back of the V210 server.

ATTENTION

Do not power up the server at this time.