
Chapter 2 - Hardware Installation
MGC-100  Hardware Installation
Unpacking and Positioning the MGC-100 
To unpack and position the 
1.When you receive your 
Wood Packing Case
Carrying Strap
Lock in Closed Position ![]()
Lock in Open Position
Figure 2-1:  MGC-100  package
2.Place the 
•Operating temperature: 
•Humidity: 
•Altitude: Up to 3,000m (10,000ft)
•ESD: +8 kV