
If the [Enter] button is pressed while on checking the details, the user can modify the details immediately.
3.Presses the [Enter] button anda popup menu to modify/add/delete the schedule will appear.
♦ Dial [1] to review the the current details. ♦ Dial [2] to add a new schedule.
♦ Dial [3] to modify the details.
♦
♦ Dial [4] to delete the selected schedule. Then, the “Do you want to remove?” message will appear. Select [OK] to delete the schedule.
4. Press the [End] button to return to the idle screen.
Delete All Schedules
1. Dial [3] from the
Figure 6.40 Selecting the [Daily planner] Menu
2.Use the direction buttons to select the required date and the scheduled events will be indicated on the left of the LCD. Each date with a scheduled event will be indicated..