Section 5: Maintenance

5.1 Maintenance Intervals

 

Check warning signs on equipment for good legibility

Daily:

and completeness.

 

 

Weekly:

Check function of the “On/Off” Switch.

 

 

Every 3

Check shear plate in “DD” dosing station, and wiper in

“DT” dosing station.

months:

 

 

 

Check that all electrical and mechanical connections

Every 6

are tight.

months:

Check adjustment of the level probes (optional).

 

 

 

Annually:

Check dosing disc in dosing station DD/DT.

 

 

Each time

Clean the dosing station.

after

Check shear plate or wiper.

material

Check dosing disc.

Is changed:

5.2 Removing the Shear plate (DD feeder only)

Removing the shear plate

1. Empty the dosing station.

Figure

2. Open the profile clamp

(B) on the dosing hopper.

3. Remove the dosing hopper from the dosing unit.

4. Open the safety screws at the toggle-type fasteners.

5. Open the toggle-type fasteners on the dosing motor.

Digital Dosing Units

46

Page 46
Image 46
Sterling Plumbing 882 00276.00 specifications Maintenance Intervals, Removing the Shear plate DD feeder only