Removal and Installation Procedures
6-38 AWG510 & AWG520 Service Manual







 

 




Figure 6-17: A75Noise Generator Board and A71 (AWG510)/A72 (AWG520)
Output Board removal
4. Reinstallation: Do, in reverse order, steps 3a through 3c reversing the
removal instructions of each step to reinstall the Output board. Then refer to
the procedure A75 Noise Generator Board (page 6–37) and Cabinet (page
6–20) to complete the reassembly.