4 Replacement Procedures | 4.6 Switch membrane |
Installing the switch membrane
The following describes the procedure for installing the switch membrane (See Figure
1.Connect the switch membrane to the connector CN9650 on the system board.
2.Slide the switch membrane to install and secure it with the following screw.
• M2.5⋅2.8B FLAT BIND screw | x1 |
3. Install the LCD CON holder and secure it with the following screw.
• M2.5⋅6B | FLAT BIND screw | x1 |
NOTE: When installing the LCD CON holder, be careful not to catch harnesses, cables and the core of the LCD harness.
QOSMIO F10 Maintenance Manual |