Manuals
/
Vanguard Managed Solutions
/
Computer Equipment
/
Network Card
Vanguard Managed Solutions
6500 PLUS
installation manual
Installing Nodes in Modulus Enclosures
Models:
6500 PLUS
1
52
102
102
Download
102 pages
31.01 Kb
49
50
51
52
53
54
55
56
Troubleshooting
Specs
Install
DSU Input and Output Signaling
Connecting a Trim Card
Configurations
Diagnostics Menu
Access Serial
Procedure
Replacement Card
Page 52
Image 52
Installing Nodes in Modulus Enclosures
2-44
Installation
Page 51
Page 53
Page 52
Image 52
Page 51
Page 53
Contents
Vanguard Managed Solutions
Restricted Rights Notification for U.S. Government Users
Restricted Rights Legend
Proprietary Material
Radio Frequency Interference Regulations
Page
Contents
Contents
Overview
About This Manual
This Chapter Describes
Mise en garde
Level
Chapter
Features
Software Features
Protocols
Hardware
Card Types
Processor Cards
Support Cards
Standalone
Enclosures and Backplanes
Enclosure
Supports Other
VanguardMS
Products
Types of Modulus
6500PLUS Processor Cards
Configurations
6525PLUS Network
Concentrator
Port
Plus Processor Card Front Panel
Hardware
6500PLUS Auxiliary Processor Cards
6500PLUS Asynchronous and Universal I/O Cards
AIO Card
UIO Card
Card Type Works with Port Types Split Speed
Plus Universal I/O or Asynchronous I/O Card Front Panel
6500PLUS Network Storage Option Card
NSO Card
Plus Network Storage Option Card
6500PLUS Token Ring Interface Module Option
Token Ring Interface Module Trim Card
Hardware
6500PLUS Integral DSU
Hardware
Components
DSU Interface
Page
Installation Overview
Chapter
Installing Standalone Units
Unpacking
Site Preparation
Example
Installation
Procedure
Step Action Description/Result
Rear View
Replacing Processor Cards in Standalone Enclosures
Step Action
Remove the Standalone Enclosure Door
Bottom of Standalone Enclosure
Using Screwdriver on Locking Tabs
Locking Tabs
Replacement Card
Plus Processor Card with Retaining Screw
Step Action
Additional
Installing Nodes in Modulus Enclosures
Information
Multiprocessor Nodes
Multiprocessor
Node Example
Operation
Replacing Master Processor of Multi-Processor Node
Action Result/Description
Installing Nodes in Modulus Enclosures
Adding a Secondary 6500PLUS Processor with Flash
When To Add Another Processor with Flash Before You Begin
Step Action Result/Description
Select Enable Flash
Maintaining
Current Software
Revision
Upgrading with Software From the New Processor Card
Select Copy Software to Flash
Installing/Replacing Processor Cards
Modulus 8/18
Requirements for Installing a Trim Card
Product Description Code
Trim Card Rear Filler Panel for Modulus 8/18 Enclosures
Guidelines for Installing a Trim Card in a Modulus 8/18
Trim Card Spacing in a Modulus 18 Enclosure
10. Trim Card Rear Filler Panel for Modulus 9/21 Enclosures
Installing Nodes in Modulus Enclosures
11. Trim Card In Left-most Position of Modulus 21 Enclosure
Enclosure
Between Two Backplanes
Plus
Installing Nodes in Modulus Enclosures
Installing and Connecting a Trim Card
Attaching a Trim Card
Installing
Connecting a Trim Card
Attaching
Cables
Removing/Replacing Trim Cards
Before Removing
Trim Cards
TRIM/Processor Card
Preparing Modulus Enclosures for RFI Suppression
Modulus 18 with
Installing RFI
Suppression
Screen
Modulus 18 RFI
No Trim Card
15. RFI Suppression Straps Modulus 18 No Trim Card
RFI Suppression
Modulus 21
Bar
Node Startup
Starting Up the Node
Ctp CR
Replacing Processor Card Components
Processor Card
Replacing DIMs
Removal
New DIM
19. Jumpers on the Port Interface Pins
Jumpers
20. Installing Jumpers on the Port Interface Pins
Installing SIMMs
Guidelines
21. Simm Installation
Replacing Flash Modules
22. Flash Module Installation
Replacing ID Modules
Module
Replacing Prom Chips
Chips
Replacing the Cmem Chip
DSU DIM Installation
Installing the DSU
Control Terminal
Configuring the 6500PLUS for DSU Operation
Input Signals
DSU Input and Output Signaling
Output Signals
24. Diagnostics Menu
Loopback Options
Troubleshooting DSU DIM Installation
Troubleshooting
Type of Interface
DSU DIM FCC Information
Facility Interface
DSU DIM Installation
Power-Up Verification
Checking
Lights
Event Result/Description
Power-Up
Diagnostics
Setting Node to Default Configuration
Node
Installing Software Options
Accessing Node Serial Number from Node Statistics
Access Serial
Number
Status/Statistics Select Node Stat
25. Serial Number on Node Stat Screen
Enabling a Software Access Key
Configure Select Software Key Table
Follow These
Steps
Installing New Software Options in an Existing Network
Install New
Enhanced LAN Option
Appendix a
Cables
Function/Signal Pin
Function/Signal
Pin
Name Position
Position Signal Name
35/V.36 Modulus 9/21 Enclosures
Function Pin
Function
Signals Modulus 9/21 Enclosures
35/V.36 Signals Standalone and Modulus 8/18 Enclosures
Signals Standalone and Modulus 8/18 Enclosures
Position Name
Pin Function
Page
Physical Characteristics
Specifications
Unit Dimensions
Environmental
Power Requirements
Limits
Index
DIM
LL 2-69RS
Top
Page
Image
Contents