Inverter/Charger Installation
2.Connect the wires labelled “INV1
3.Connect L1 (from the L1 output Power Distribution Bar) and L2 (from the L2 output Power Distribution Bar), Neutral, and Ground to the
4.Connect L1 and L2 from the input side of the AC1 Breaker (L1 and L2 Power Distribution bars) to the utility grid AC Panel. Connect Neutral from the XW Power Distribution Panel to the utility grid AC panel. Connect the ground wire between the XW Power Distribution Panel and the utility grid AC panel.
Power Distribution bars in the XW Power Distribution
Panel accept up to a #2/0 AWG cable (maximum).
See Figure
Actual wiring requirements may vary.