Test System Operation (Simulate a Power Outage)
Partial disassembly and special tools are required to accurately measure voltage output and frequency. For this reason we recommend you have an authorized Service Dealer test the system operation.
1. | Set the generator’s system switch to OFF. |
|
| ||||||||||||
2. | Remove the 15 Amp fuse in control panel. |
|
| ||||||||||||
3. | Remove four screws that hold circuit breaker cover to air | ||||||||||||||
| intake guard. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4. | Connect an accurate voltage and frequency meter to line | ||||||||||||||
| side of generator’s main circuit breaker. |
|
|
|
|
| |||||||||
5. | Set generator’s main circuit breaker to ON (closed) |
|
| ||||||||||||
| position. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6. | Install 15 Amp fuse in control panel. |
|
|
|
|
| |||||||||
7. | Set generator’s system switch to AUTO. |
|
|
|
|
| |||||||||
8. | Turn utility power OFF. Once the 10 second timer has | ||||||||||||||
| expired, the engine will crank and start. |
|
|
|
|
| |||||||||
9. | The transfer switch will transfer to Generator power. |
|
| ||||||||||||
10. | Apply various loads to the generator and observe its |
|
| ||||||||||||
| performance. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11. | Exercise the generator under varying loads for 30 |
|
| ||||||||||||
| minutes. Monitor the output voltage and frequency |
|
| ||||||||||||
| of the generator to verify it’s performance is within |
|
| ||||||||||||
| specifications. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12. | Turn utility power ON. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13. | When the load is transferred back to the utility power | ||||||||||||||
| source, the engine | er starts timing. |
|
| |||||||||||
14. | The generator will run for abo |
|
|
| nute to cool |
|
| ||||||||
ut one mi |
|
| |||||||||||||
| down, then the generator wil | l stop. |
|
|
|
|
|
|
|
|
| ||||
|
| NOT |
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
| ||||||||
|
|
|
|
|
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
| REPRODUCTION | ||||
|
|
|
|
| FOR | back | |||||||||
NOTE: Minimum engine run time is 5 mi nutes. If trans | |||||||||||||||
to utility occurs before 5 | nutes the |
|
|
| erator wil still run |
for 5 minutes.
23