Extron electronic 305SA manual Installation Overview

Page 13

Installation

Overview

This overview outlines the basic steps for installing the PoleVault IP System. An outline and checklist of the stages (Stages One through Five), listing the relevant steps within each stage, is given on page 10 and rear cover.

A fully detailed description of these steps is given in the five corresponding sections.

Carefully check inventory of PoleVault IP System packages, input and output devices, any optional accessories, and installation hardware before commencing.

NOTES:

Additional installation hardware is needed for this installation, and should be supplied by the installer. See Items Not Included on page 8 for a list of items that you may need.

Refer to local building standards and codes to verify that the installation will meet all the regulatory requirements.

Observe all local and national building and safety codes, UL requirements, and ADA Accessibility Guidelines.

PoleVault IP Systems • Installation Overview

9

Image 13
Contents PoleVault IP Systems Sicherheitsanweisungen Deutsch Safety InstructionsGuide on the Extron website FCC Class B NoticeConventions Used in this Guide Specifications AvailabilityLetter o Variables are written in slanted form as shown herePoleVault IP System OverviewPoleVault IP System Installation and Wiring Overview Typical Classroom Installation Before You Begin Planning the InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Included Items InventorySee rear cover for contact numbers KitsItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Mark Screen Location Install Projector to Verify LocationMark the screen location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Viii. Evenly balanced configuration Using the slots on the bracket that areClosest to the barrel on each arm, place Verify the Image Location Slide and lock the projector onto the adjuster plateMark the structural ceiling for lag eye bolt installation Preliminary Safety Hardware InstallationCut the Ceiling Tile Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Attach the turnbuckles at the corners of the PCM Secure the Projector Drop Ceiling Mount to the CeilingHand tighten all four turnbuckles Shock or serious injury. For safety Install the Electrical Box if requiredInstall the Raco box and plaster ring onto the PCM Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates MLC 104 IP Plus installation PVT transmitter installationMLS 104 IP Plus MediaLink Controller Cabling for the Wallplates and MediaLink ControllerFeatures for MLC Mud Ring Installation Install the Mud RingsInsert the PVT mud ring into the wall Provide strain relief Signal Cable Label colorPull the cables at each location Install Wall Plates Connect the MLC 104 IP Plus to the switcher Install MediaLink ControllerTerminal RS-232 Cable color Pin Connect to the LAN using a CAT 5 cableTCP/IP Connections made to the MLC 104 IP PlusSpeaker Installation Stage 3 Involves Installing the Devices Shown BelowFF 120 Flat Field Ceiling Speakers Cabling for the SpeakersCut Ceiling Tile Install the Speaker on the Drop CeilingMark and cut the tile Attach safety cable Wire the captive screw connector Terminate the Speaker Cable for the PVS SwitcherStereo or dual mono output using parallel speaker wiring Stereo output Dual mono outputStage 4 Involves Installing the Devices Shown Below PVS 305SA IP PoleVault SwitcherPMK 550 Pole Mount Kit Rear ViewInstall the PMK 550 Base Plate Switcher and Projector Cable Overview Pull the Cables at the Switcher locationGather the cables, pass them down the pipe Your completed connections should look like the image below Finish installing the Pole Mount KitConfigure the Switcher MLS Switcher Configuration Program Stage 5 Involves Installing the Programs Shown BelowConfigurator Configure the System GlobalTest the System Check that an image is present, and adjust as neededAdjust the audio levels on the PVS 305SA IP Test the MLC configuration is correctFinal Installation Any changes to the Edid settings as needed Using Preset ModeWhen the image is correct, re-install the wallplate Preset Switch setting Resolution NumberOn the rear panel, set all the DIP switches to off down Using Learn Mode Available on PVT RGB D Plus onlyInstallation Procedure Optional Accessory Installation VoiceLift SystemVoiceLift System Included parts Priority Page Sensor Kit Included Parts Optional Accessory Installation Priority Page Sensor KitPoleVault Switchers PVS, available at Configuration program for MLSTesting and Adjustment Procedure Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps