Extron electronic 305SA manual Install Wall Plates

Page 29

3. — Install Wall Plates

a. Connect the CAT 5 cables to the rear of the

input devices (for RGB devices, connect cable

labeled A to port A and cable B to port B). For

PVT CV D plates connect the single cable to the

device.

b. Run LAN cables (included) to the rear of the

PVT RGB D IP Plus, and connect to the RJ-45

pass-through connectors on the rear panel.

c. With PVT RGB D IP Plus plates, for podcasting

or recording applications, use a three conductor

audio cable and connect the audio return to

the connector marked G (ground wire), R (black

wire), and L (red wire). The other end will be

connected to the Line Out connection on the

PVS 305SA IP switcher.

d. If desired wire the IR connection using a

two conductor cable. Wire the ground to G

and signal lead to S. The other end will be

connected to the IR Out port of the

ÑConnect the cables to the AV source input devices at each location.

Wall

Mud Ring

LAN cables

MLC 104 IP Plus controller.

TIP: Before completing the installation of the

PVT RGB D IP Plus wallplate, see EDID

MInder on page 42 for setup and

operating details.

AUDIOOUT

IN

IN COMPUTER

OUT MONITOR

G

S

IR OUT

Extron®

PVT RGB D IP Plus

CAT5e

CAT5e

e.

Mount each device into the mud ring, using the

 

supplied screws.

f.

Attach the supplied Decora® faceplate.

g.

Label the Decora plate with the supplied label,

 

using the appropriate input number. This makes

 

inputs easier to identify when configuring the

 

switcher.

h.

Repeat steps a through g for other wall plates.

CAT 5 cables

from PoleVault® Switcher

Decora®

Faceplate

AUDIO

IN OUT

CAT5e

COMPUTER IN

MONITOR OUT

S G

CAT5e

 

IR OUT

®Mount the PVT in the mud ring then ©attach the Decora faceplate.

PoleVault IP Systems • Installation — Stage 2 (Wallplates and MLC)

25

Image 29
Contents PoleVault IP Systems Sicherheitsanweisungen Deutsch Safety InstructionsGuide on the Extron website FCC Class B NoticeConventions Used in this Guide Specifications AvailabilityLetter o Variables are written in slanted form as shown herePoleVault IP System OverviewPoleVault IP System Installation and Wiring Overview Typical Classroom Installation Before You Begin Planning the InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Included Items InventorySee rear cover for contact numbers KitsItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Mark Screen Location Install Projector to Verify LocationMark the screen location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Closest to the barrel on each arm, place Using the slots on the bracket that areViii. Evenly balanced configuration Verify the Image Location Slide and lock the projector onto the adjuster plateMark the structural ceiling for lag eye bolt installation Preliminary Safety Hardware InstallationCut the Ceiling Tile Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Hand tighten all four turnbuckles Secure the Projector Drop Ceiling Mount to the CeilingAttach the turnbuckles at the corners of the PCM Shock or serious injury. For safety Install the Electrical Box if requiredInstall the Raco box and plaster ring onto the PCM Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates MLC 104 IP Plus installation PVT transmitter installationMLS 104 IP Plus MediaLink Controller Cabling for the Wallplates and MediaLink ControllerInsert the PVT mud ring into the wall Install the Mud RingsFeatures for MLC Mud Ring Installation Pull the cables at each location Signal Cable Label colorProvide strain relief Install Wall Plates Connect the MLC 104 IP Plus to the switcher Install MediaLink ControllerTerminal RS-232 Cable color Pin Connect to the LAN using a CAT 5 cableTCP/IP Connections made to the MLC 104 IP PlusSpeaker Installation Stage 3 Involves Installing the Devices Shown BelowFF 120 Flat Field Ceiling Speakers Cabling for the SpeakersMark and cut the tile Install the Speaker on the Drop CeilingCut Ceiling Tile Attach safety cable Wire the captive screw connector Terminate the Speaker Cable for the PVS SwitcherStereo or dual mono output using parallel speaker wiring Stereo output Dual mono outputStage 4 Involves Installing the Devices Shown Below PVS 305SA IP PoleVault SwitcherPMK 550 Pole Mount Kit Rear ViewInstall the PMK 550 Base Plate Gather the cables, pass them down the pipe Pull the Cables at the Switcher locationSwitcher and Projector Cable Overview Your completed connections should look like the image below Finish installing the Pole Mount KitConfigure the Switcher MLS Switcher Configuration Program Stage 5 Involves Installing the Programs Shown BelowConfigurator Configure the System GlobalTest the System Check that an image is present, and adjust as neededAdjust the audio levels on the PVS 305SA IP Test the MLC configuration is correctFinal Installation Any changes to the Edid settings as needed Using Preset ModeWhen the image is correct, re-install the wallplate Preset Switch setting Resolution NumberOn the rear panel, set all the DIP switches to off down Using Learn Mode Available on PVT RGB D Plus onlyVoiceLift System Included parts Optional Accessory Installation VoiceLift SystemInstallation Procedure Priority Page Sensor Kit Included Parts Optional Accessory Installation Priority Page Sensor KitPoleVault Switchers PVS, available at Configuration program for MLSTesting and Adjustment Procedure Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps