4. — Install MediaLink Controller

TIP: Before cabling and installing the

MLC 104 IP Plus, locate and write down the

MAC address of the device for configuring the

IP address. The 12 character alphanumeric

address (for example, 00-05-A6-03-9G-H4)

can be found on a label on the side of the

controller. The length of exposed wire is critical

to avoid transmission problems. Ensure the

lengths given here are adhered to when strip-

ping the cables for connection.

NOTE: If a drain wire is used, both ends of the

wire must be covered by heat shrink to avoid

accidental grounding.

a.Connect the MLC power and RS-232 control cable (part number 26-626-50) as shown.

 

Wire Bared

 

 

3/16"

Heat Shrink on

 

(5 mm)

Outer Jacket to

 

Max.

Inner Conductor

 

 

Transition

Heat Shrink on

 

Drain Wire

 

 

 

7/8"

 

 

(22 mm)

 

TIP:

Observe wire stripping lengths.

NOTE: The MLC 104 IP Plus is powered

from the PVS 305SA IP. DO NOT

connect an external power supply to

the MLC 104 IP Plus unless installing an

optional secondary control panel.

RS-232/MLC/IR

Tx Rx IR

+12V

A B C D E

PVS 305SA IP Switcher's rear panel RS-232/MLC/IR port

Heat Shrink over Drain Wire

From MLC 104 IP Plus

Wire color

To PVS 305SA IP terminal

terminal

 

 

 

 

 

 

 

 

 

A - (Rx on the MLS port)

White

A - (Tx on the RS-232 port)

 

 

 

 

 

B - (Tx on the MLS port)

Violet

B - (Rx on the RS-232 port)

 

 

 

 

 

MLS RS-232 Ground

Drain wire

D - Ground

 

 

 

 

 

 

 

 

 

 

Power Ground

Black

D - Ground

 

 

 

 

 

 

 

 

 

 

12 V In

Red

E - +12 V

 

 

 

 

 

+12 VDC

Ground ( )

Ground ( )

BReceive (Rx) Transmit (Tx) B

A Transmit (Tx) Receive (Rx) A

Heat Shrink

 

 

 

 

 

over Drain Wire

 

 

 

 

 

NOTE: If you use cable that has a drain wire, tie

Rx

Tx

GROUND

GROUND

+12VIN

the drain wire to ground at both ends.

Apply heat shrink cover to both ends of the

A

B

 

 

 

 

MLS

 

PWR

wire to avoid accidental grounding.

 

 

RS-232

12V

 

MLC's MLS and

Power ports

ÜConnect the MLC 104 IP Plus to the switcher.

26PoleVault IP Systems • Installation — Stage 2 (Wallplates and MLC)

Image 30
Contents PoleVault IP Systems Safety Instructions Sicherheitsanweisungen DeutschFCC Class B Notice Guide on the Extron websiteLetter o Specifications AvailabilityConventions Used in this Guide Variables are written in slanted form as shown hereOverview PoleVault IP SystemPoleVault IP System Installation and Wiring Overview Before You Begin Planning the Installation Typical Classroom InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Inventory Included ItemsKits See rear cover for contact numbersItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Mark the screen location Install Projector to Verify LocationMark Screen Location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Using the slots on the bracket that are Viii. Evenly balanced configurationClosest to the barrel on each arm, place Slide and lock the projector onto the adjuster plate Verify the Image LocationCut the Ceiling Tile Preliminary Safety Hardware InstallationMark the structural ceiling for lag eye bolt installation Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Secure the Projector Drop Ceiling Mount to the Ceiling Attach the turnbuckles at the corners of the PCMHand tighten all four turnbuckles Install the Raco box and plaster ring onto the PCM Install the Electrical Box if requiredShock or serious injury. For safety Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates MLS 104 IP Plus MediaLink Controller PVT transmitter installationMLC 104 IP Plus installation Cabling for the Wallplates and MediaLink ControllerInstall the Mud Rings Features for MLC Mud Ring InstallationInsert the PVT mud ring into the wall Signal Cable Label color Provide strain reliefPull the cables at each location Install Wall Plates Install MediaLink Controller Connect the MLC 104 IP Plus to the switcherConnect to the LAN using a CAT 5 cable Terminal RS-232 Cable color PinConnections made to the MLC 104 IP Plus TCP/IPFF 120 Flat Field Ceiling Speakers Stage 3 Involves Installing the Devices Shown BelowSpeaker Installation Cabling for the SpeakersInstall the Speaker on the Drop Ceiling Cut Ceiling TileMark and cut the tile Attach safety cable Stereo or dual mono output using parallel speaker wiring Terminate the Speaker Cable for the PVS SwitcherWire the captive screw connector Stereo output Dual mono outputPMK 550 Pole Mount Kit PVS 305SA IP PoleVault SwitcherStage 4 Involves Installing the Devices Shown Below Rear ViewInstall the PMK 550 Base Plate Pull the Cables at the Switcher location Switcher and Projector Cable OverviewGather the cables, pass them down the pipe Finish installing the Pole Mount Kit Your completed connections should look like the image belowStage 5 Involves Installing the Programs Shown Below Configure the Switcher MLS Switcher Configuration ProgramConfigure the System Global ConfiguratorCheck that an image is present, and adjust as needed Test the SystemTest the MLC configuration is correct Adjust the audio levels on the PVS 305SA IPFinal Installation When the image is correct, re-install the wallplate Using Preset ModeAny changes to the Edid settings as needed Preset Switch setting Resolution NumberUsing Learn Mode Available on PVT RGB D Plus only On the rear panel, set all the DIP switches to off downOptional Accessory Installation VoiceLift System Installation ProcedureVoiceLift System Included parts Optional Accessory Installation Priority Page Sensor Kit Priority Page Sensor Kit Included PartsTesting and Adjustment Procedure Configuration program for MLSPoleVault Switchers PVS, available at Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps