Introduction

Overview

This guide covers the installation of the Extron PoleVault IP System in a drop ceiling room with a wood or concrete structural ceiling. If the location has a concrete or beam style ceiling, alternative ceiling mounts can be obtained separately from Extron.

It is assumed that the installer has some knowledge and experience of AV, electrical, or electronic device installation. This guide takes the AV installer through the steps for installation and connection of each of the system component parts.

It may be that the locations for the devices (for example, wall plates, projector, and screen) have been pre-determined. However, some room installation examples are given to help in installations where final location is yet to be determined.

The PoleVault IP System

Extron PoleVault IP Systems are easy-to-use, network-enabled, all-inclusive packages, making them ideal for single-projector classrooms. PoleVault IP Systems use economical twisted pair cables for transmitting signals and include network connectivity for Web-based asset management, monitoring, and control.

NOTES:

The hardware and devices listed on the inventory pages have detailed safety information, installation, set-up, and configuration instructions, and should be referred to as needed.

For operation and setup of the projector, screen, and input devices, refer to the relevant manufacturer manuals supplied with those devices.

A PoleVault System Installation video is viewable online at www.extron.com. This video is also a step by step guide to installing PoleVault System and is useful for first-time installations.

Specifications Availability

Product specifications are available on the Extron website, www.extron.com.

PoleVault IP Systems • Introduction

1

Image 5
Contents PoleVault IP Systems Sicherheitsanweisungen Deutsch Safety InstructionsGuide on the Extron website FCC Class B NoticeConventions Used in this Guide Specifications AvailabilityLetter o Variables are written in slanted form as shown herePoleVault IP System OverviewPoleVault IP System Installation and Wiring Overview Typical Classroom Installation Before You Begin Planning the InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Included Items InventorySee rear cover for contact numbers KitsItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Mark Screen Location Install Projector to Verify LocationMark the screen location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Closest to the barrel on each arm, place Using the slots on the bracket that areViii. Evenly balanced configuration Verify the Image Location Slide and lock the projector onto the adjuster plateMark the structural ceiling for lag eye bolt installation Preliminary Safety Hardware InstallationCut the Ceiling Tile Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Hand tighten all four turnbuckles Secure the Projector Drop Ceiling Mount to the CeilingAttach the turnbuckles at the corners of the PCM Shock or serious injury. For safety Install the Electrical Box if requiredInstall the Raco box and plaster ring onto the PCM Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates MLC 104 IP Plus installation PVT transmitter installationMLS 104 IP Plus MediaLink Controller Cabling for the Wallplates and MediaLink ControllerInsert the PVT mud ring into the wall Install the Mud RingsFeatures for MLC Mud Ring Installation Pull the cables at each location Signal Cable Label colorProvide strain relief Install Wall Plates Connect the MLC 104 IP Plus to the switcher Install MediaLink ControllerTerminal RS-232 Cable color Pin Connect to the LAN using a CAT 5 cableTCP/IP Connections made to the MLC 104 IP PlusSpeaker Installation Stage 3 Involves Installing the Devices Shown BelowFF 120 Flat Field Ceiling Speakers Cabling for the SpeakersMark and cut the tile Install the Speaker on the Drop CeilingCut Ceiling Tile Attach safety cable Wire the captive screw connector Terminate the Speaker Cable for the PVS SwitcherStereo or dual mono output using parallel speaker wiring Stereo output Dual mono outputStage 4 Involves Installing the Devices Shown Below PVS 305SA IP PoleVault SwitcherPMK 550 Pole Mount Kit Rear ViewInstall the PMK 550 Base Plate Gather the cables, pass them down the pipe Pull the Cables at the Switcher locationSwitcher and Projector Cable Overview Your completed connections should look like the image below Finish installing the Pole Mount KitConfigure the Switcher MLS Switcher Configuration Program Stage 5 Involves Installing the Programs Shown BelowConfigurator Configure the System GlobalTest the System Check that an image is present, and adjust as neededAdjust the audio levels on the PVS 305SA IP Test the MLC configuration is correctFinal Installation Any changes to the Edid settings as needed Using Preset ModeWhen the image is correct, re-install the wallplate Preset Switch setting Resolution NumberOn the rear panel, set all the DIP switches to off down Using Learn Mode Available on PVT RGB D Plus onlyVoiceLift System Included parts Optional Accessory Installation VoiceLift SystemInstallation Procedure Priority Page Sensor Kit Included Parts Optional Accessory Installation Priority Page Sensor KitPoleVault Switchers PVS, available at Configuration program for MLSTesting and Adjustment Procedure Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps