Extron electronic 305SA manual Provide strain relief, Signal Cable Label color

Page 28

2.— Pull the Cables (at the input locations) The following cables need to be installed:

CAT 5 cables for signal transmission from the AV wall plates to the PVS 305SA IP

NOTES:

For PVT RGB D IP Plus four CAT 5 cables (two for video input and two for LAN) are needed, and for PVT RGB D wall plates, two CAT 5 signal cables for each input are needed.

Maximum distance from the

PVS 305SA to the Wallplate is 100 feet.

The optimum distance is between 50 and 75 feet. Minimum distance is 15 feet.

CAT 5 cables supplied are terminated to the TIA 568A standard. Other CAT 5 cables can be used if they are TIA 568A or 568B standards and terminated to the same standard at both ends.

CAT 5 cables (included) for MLC network connection.

PoleVault switcher communication cable from the MediaLink controller (MLC PW/RS-232/VC, 50 feet, part number 26-626-50)

Projector communication cables from the MediaLink controller (IR Serial Comm, 50 feet, part number 26-621-50)

a.Drill cable pathways through any obstructions (for example, wall caps, fire-breaks, or horizontal studs).

b.Label the CAT 5 signal cables at both ends with the supplied labels.

c.Pull the cabling through the wall from the ceiling space down to the location of the transmitters and other wall devices, and out through the openings.

TIP: Secure cables with cable clamps to

provide strain relief.

Signal Cable

Label color

 

 

RGB 1A (Input 1 RGB)

Orange

RGB 1 B (Input 1 RGB)

Orange

 

 

RGB 2A (Input 2 RGB)

Yellow

RGB 2B (Input 2 RGB)

Yellow

 

 

RGB 3A (Input 3 RGB)

Magenta

RGB 3B (Input 3 RGB)

Magenta

 

 

RGB 4A (Input 4 RGB)

Light Green

RGB 4B (Input 4 RGB)

Light Green

 

 

Video 3 (Input 3 Composite Vid)

Dark Green

 

 

Video 4 (Input 4 Composite Vid)

Red

 

 

NOTE: Fasten the colored section to the cable first, then wrap the clear section around it.

RGB #1A

ÉUse the supplied labels for clear cable identification during installation.

ÎPull the cables at each location.

24PoleVault IP Systems • Installation — Stage 2 (Wallplates and MLC)

Image 28
Contents PoleVault IP Systems Safety Instructions Sicherheitsanweisungen DeutschFCC Class B Notice Guide on the Extron websiteSpecifications Availability Conventions Used in this GuideLetter o Variables are written in slanted form as shown hereOverview PoleVault IP SystemPoleVault IP System Installation and Wiring Overview Before You Begin Planning the Installation Typical Classroom InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Inventory Included ItemsKits See rear cover for contact numbersItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Install Projector to Verify Location Mark Screen LocationMark the screen location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Viii. Evenly balanced configuration Using the slots on the bracket that areClosest to the barrel on each arm, place Slide and lock the projector onto the adjuster plate Verify the Image LocationPreliminary Safety Hardware Installation Mark the structural ceiling for lag eye bolt installationCut the Ceiling Tile Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Attach the turnbuckles at the corners of the PCM Secure the Projector Drop Ceiling Mount to the CeilingHand tighten all four turnbuckles Install the Electrical Box if required Shock or serious injury. For safetyInstall the Raco box and plaster ring onto the PCM Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates PVT transmitter installation MLC 104 IP Plus installationMLS 104 IP Plus MediaLink Controller Cabling for the Wallplates and MediaLink ControllerFeatures for MLC Mud Ring Installation Install the Mud RingsInsert the PVT mud ring into the wall Provide strain relief Signal Cable Label colorPull the cables at each location Install Wall Plates Install MediaLink Controller Connect the MLC 104 IP Plus to the switcherConnect to the LAN using a CAT 5 cable Terminal RS-232 Cable color PinConnections made to the MLC 104 IP Plus TCP/IPStage 3 Involves Installing the Devices Shown Below Speaker InstallationFF 120 Flat Field Ceiling Speakers Cabling for the SpeakersCut Ceiling Tile Install the Speaker on the Drop CeilingMark and cut the tile Attach safety cable Terminate the Speaker Cable for the PVS Switcher Wire the captive screw connectorStereo or dual mono output using parallel speaker wiring Stereo output Dual mono outputPVS 305SA IP PoleVault Switcher Stage 4 Involves Installing the Devices Shown BelowPMK 550 Pole Mount Kit Rear ViewInstall the PMK 550 Base Plate Switcher and Projector Cable Overview Pull the Cables at the Switcher locationGather the cables, pass them down the pipe Finish installing the Pole Mount Kit Your completed connections should look like the image belowStage 5 Involves Installing the Programs Shown Below Configure the Switcher MLS Switcher Configuration ProgramConfigure the System Global ConfiguratorCheck that an image is present, and adjust as needed Test the SystemTest the MLC configuration is correct Adjust the audio levels on the PVS 305SA IPFinal Installation Using Preset Mode Any changes to the Edid settings as neededWhen the image is correct, re-install the wallplate Preset Switch setting Resolution NumberUsing Learn Mode Available on PVT RGB D Plus only On the rear panel, set all the DIP switches to off downInstallation Procedure Optional Accessory Installation VoiceLift SystemVoiceLift System Included parts Optional Accessory Installation Priority Page Sensor Kit Priority Page Sensor Kit Included PartsConfiguration program for MLS PoleVault Switchers PVS, available atTesting and Adjustment Procedure Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps