Extron electronic 305SA manual Finish installing the Pole Mount Kit

Page 40
• Lan 1 - TCP/IP Ethernet
• Lan 2 - MLC controller
• Lan 3 - RGB D IP Plus RJ-45pass-through
• Lan 4 - RGB D IP Plus RJ-45pass-throughM Power supply. Do not apply power yet.

3. — Finish installing the Pole Mount Kit

CAUTION: The PoleVault signal transmission method is specific for PVS 305SA IP switchers working with PVT wallplates. DO NOT connect the input ports to an MTP system or to an LAN or data transmission system.

Connect the cables as follows to the switcher:

A RGB D IP Plus Input wall plate (CAT 5) cables according to the cable labels

B RGB CV D Input wall plate (CAT 5) cables according to the cable labels

NOTE: The default input signal for the switcher ports 3 and 4 is video. Do not connect an RGB cable

(cable A) to ports 3A and 4A when connecting composite video cables to ports 3B and 4B. If using

VGA inputs for ports 3 or 4, the ports must be reconfigured using the MLS Configuration software utility

on the supplied DVD or at www.extron.com.

C Aux audio input 5 cable

I VoiceLift Receiver cable (optional)

D VGA output cable

J Paging sensor cable (optional)

E RCA output cable

K Vol/Mute control.

F Amp audio output to speakers

L Pass-through LAN cables as follows:

G Line out cable to an assistive or recording device (optional, see audio warning card for details)

H Control/power cable from MLC 104 IP Plus

Your completed connections should look like the image below.

AUDIO

IN OUT

COMPUTER IN

MONITOR OUT

SG IR OUT

1BRGB

1ARGB

CAT5e

 

LAN pass-through

 

LAN

cables with RJ-45 connectors to

CAT5e

LAN

4-port Ethernet switch

 

 

inputs 3 and 4 (see 12 )

PVT RGB D IP Plus

Video/audio Inputs

(2 CAT 5 cables, A and B with RJ-45 connectors)

Line Out Output (audio)

Speaker

PVS terminal

wire color

(left and right)

 

 

Red

Positive (+)

Black

Negative (-)

 

 

Audio Output

4-port 10/100

to Speakers

Ethernet Switch

 

Connect to ports as follows:

 

1.

TCP/IP network

 

2.

MLC controller

 

3.

PVT RGB D IP Plus RJ-45 pass-through

 

4.

PVT RGB D IP Plus RJ-45 pass-through

1

7

6

12

N15779

I

POWER N P

U

T

S

12V

5A MAX

13

1A RGB

2A RGB

3A RGB

4A RGB

 

 

 

 

1B RGB

2B RGB

3B RGB

4B RGB

/VIDEO

/VIDEO

 

 

2

 

OUTPUTS

VOICELIFT

 

VIDEO

RGB

RECEIVER

 

4

5

9

 

LINE OUT

AMPLIFIED AUDIO OUT

 

 

 

DO NOT

 

 

 

 

 

 

GROUND

 

 

 

 

 

 

OR SHORT

 

 

 

2/4/8

 

 

SPEAKER

 

 

 

Ohms

L

R

OUTPUTS

 

 

 

 

CLASS 2 WIRING

L

R

 

 

 

 

L

R

10V

50mA

CONTROL

 

 

 

 

 

Tx Rx IR

12V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AUX AUDIO

 

PAGING

 

 

RS-232 MLC/IR

INPUT 5

 

SENSOR

VOL/MUTE

3 10 11 8

LAN 3

LAN 4

LAN 1

LAN 2

PVT CV D Input

 

(CAT 5 cable with

VIDEO

RJ-45 connector)

Power

3B

Connector

 

 

VIDEO IN

 

AUDIO IN

L

R

 

S G

 

IR OUT

External Power Supply

 

(12 VDC, 5 A max.)

 

VGA

VoiceLift

Paging

Connector

Receiver

Sensor

 

RCA

10V

 

Connector

Vol/Mute

RGB Output

 

Aux Audio Control

to Projector

 

Input 5

Composite Video Output to Projector

MLC 104 IP Plus RS-232 input

 

MLC

To PVS terminal

 

wire color

 

 

 

 

White

A - (Tx on RS-232 port)

 

Violet

B - (Rx on RS-232 port)

 

Drain wire

D - Ground (

 

)

 

 

 

 

 

Black

D - Ground (

 

)

 

Red

 

E - +12 V

 

 

 

 

 

 

+12 VDC

 

 

 

 

Ground (

)

 

 

 

Ground (

)

 

 

 

Receive (Rx) B

Transmit (Tx) A

36PoleVault IP Systems • Installation — Stage 4 (PMK 550 and PVS 305SA IP)

Image 40
Contents PoleVault IP Systems Safety Instructions Sicherheitsanweisungen DeutschFCC Class B Notice Guide on the Extron websiteSpecifications Availability Conventions Used in this GuideLetter o Variables are written in slanted form as shown hereOverview PoleVault IP SystemPoleVault IP System Installation and Wiring Overview Before You Begin Planning the Installation Typical Classroom InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Inventory Included ItemsKits See rear cover for contact numbersItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Install Projector to Verify Location Mark Screen LocationMark the screen location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Viii. Evenly balanced configuration Using the slots on the bracket that areClosest to the barrel on each arm, place Slide and lock the projector onto the adjuster plate Verify the Image LocationPreliminary Safety Hardware Installation Mark the structural ceiling for lag eye bolt installationCut the Ceiling Tile Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Attach the turnbuckles at the corners of the PCM Secure the Projector Drop Ceiling Mount to the CeilingHand tighten all four turnbuckles Install the Electrical Box if required Shock or serious injury. For safetyInstall the Raco box and plaster ring onto the PCM Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates PVT transmitter installation MLC 104 IP Plus installationMLS 104 IP Plus MediaLink Controller Cabling for the Wallplates and MediaLink ControllerFeatures for MLC Mud Ring Installation Install the Mud RingsInsert the PVT mud ring into the wall Provide strain relief Signal Cable Label colorPull the cables at each location Install Wall Plates Install MediaLink Controller Connect the MLC 104 IP Plus to the switcherConnect to the LAN using a CAT 5 cable Terminal RS-232 Cable color PinConnections made to the MLC 104 IP Plus TCP/IPStage 3 Involves Installing the Devices Shown Below Speaker InstallationFF 120 Flat Field Ceiling Speakers Cabling for the SpeakersCut Ceiling Tile Install the Speaker on the Drop CeilingMark and cut the tile Attach safety cable Terminate the Speaker Cable for the PVS Switcher Wire the captive screw connectorStereo or dual mono output using parallel speaker wiring Stereo output Dual mono outputPVS 305SA IP PoleVault Switcher Stage 4 Involves Installing the Devices Shown BelowPMK 550 Pole Mount Kit Rear ViewInstall the PMK 550 Base Plate Switcher and Projector Cable Overview Pull the Cables at the Switcher locationGather the cables, pass them down the pipe Finish installing the Pole Mount Kit Your completed connections should look like the image belowStage 5 Involves Installing the Programs Shown Below Configure the Switcher MLS Switcher Configuration ProgramConfigure the System Global ConfiguratorCheck that an image is present, and adjust as needed Test the SystemTest the MLC configuration is correct Adjust the audio levels on the PVS 305SA IPFinal Installation Using Preset Mode Any changes to the Edid settings as neededWhen the image is correct, re-install the wallplate Preset Switch setting Resolution NumberUsing Learn Mode Available on PVT RGB D Plus only On the rear panel, set all the DIP switches to off downInstallation Procedure Optional Accessory Installation VoiceLift SystemVoiceLift System Included parts Optional Accessory Installation Priority Page Sensor Kit Priority Page Sensor Kit Included PartsConfiguration program for MLS PoleVault Switchers PVS, available atTesting and Adjustment Procedure Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps