Extron electronic 305SA manual Configure the System Global, Configurator

Page 42

2. — Configure the System — Global

Configurator

a. Download and install Extron’s Global

Configurator (GC) configuration program

(available at www.extron.com) on the laptop

or PC.

b. Ensure the PC and the MLC 104 IP Plus are

connected to the LAN.

NOTE: Alternatively, connect a 2.5 mm TRS

configuration cable (part number

70-335-01) to the PC and to the

front panel configuration port of the MLC

104 IP Plus.

c. Launch the Global Configurator program. Click

on Help, Contents, or press <F1>.

ÇLoad Global Configurator software

ÎLaunch Global Configurator

d.Select the MLC 104 IP Plus/PoleVault system from the drop-down box. Follow the instructions on the Help page.

e.To move to the next page (as shown in the yellow box, figure 2e), click the NEXT button above the drop-down box. Repeat as needed, following the instructions on the pages to configure the MLC 104 IP Plus.

ÏSelect MLC 104 IP Plus/PoleVault IP System

ÚConfigure the MLC 104 IP Plus

38PoleVault IP Systems • Installation — Stage 5 (Configuration)

Image 42
Contents PoleVault IP Systems Safety Instructions Sicherheitsanweisungen DeutschFCC Class B Notice Guide on the Extron websiteLetter o Specifications AvailabilityConventions Used in this Guide Variables are written in slanted form as shown hereOverview PoleVault IP SystemPoleVault IP System Installation and Wiring Overview Before You Begin Planning the Installation Typical Classroom InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Inventory Included ItemsKits See rear cover for contact numbersItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Mark the screen location Install Projector to Verify LocationMark Screen Location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Using the slots on the bracket that are Viii. Evenly balanced configurationClosest to the barrel on each arm, place Slide and lock the projector onto the adjuster plate Verify the Image LocationCut the Ceiling Tile Preliminary Safety Hardware InstallationMark the structural ceiling for lag eye bolt installation Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Secure the Projector Drop Ceiling Mount to the Ceiling Attach the turnbuckles at the corners of the PCMHand tighten all four turnbuckles Install the Raco box and plaster ring onto the PCM Install the Electrical Box if requiredShock or serious injury. For safety Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates MLS 104 IP Plus MediaLink Controller PVT transmitter installationMLC 104 IP Plus installation Cabling for the Wallplates and MediaLink ControllerInstall the Mud Rings Features for MLC Mud Ring InstallationInsert the PVT mud ring into the wall Signal Cable Label color Provide strain reliefPull the cables at each location Install Wall Plates Install MediaLink Controller Connect the MLC 104 IP Plus to the switcherConnect to the LAN using a CAT 5 cable Terminal RS-232 Cable color PinConnections made to the MLC 104 IP Plus TCP/IPFF 120 Flat Field Ceiling Speakers Stage 3 Involves Installing the Devices Shown BelowSpeaker Installation Cabling for the SpeakersInstall the Speaker on the Drop Ceiling Cut Ceiling TileMark and cut the tile Attach safety cable Stereo or dual mono output using parallel speaker wiring Terminate the Speaker Cable for the PVS SwitcherWire the captive screw connector Stereo output Dual mono outputPMK 550 Pole Mount Kit PVS 305SA IP PoleVault SwitcherStage 4 Involves Installing the Devices Shown Below Rear ViewInstall the PMK 550 Base Plate Pull the Cables at the Switcher location Switcher and Projector Cable OverviewGather the cables, pass them down the pipe Finish installing the Pole Mount Kit Your completed connections should look like the image belowStage 5 Involves Installing the Programs Shown Below Configure the Switcher MLS Switcher Configuration ProgramConfigure the System Global ConfiguratorCheck that an image is present, and adjust as needed Test the SystemTest the MLC configuration is correct Adjust the audio levels on the PVS 305SA IPFinal Installation When the image is correct, re-install the wallplate Using Preset ModeAny changes to the Edid settings as needed Preset Switch setting Resolution NumberUsing Learn Mode Available on PVT RGB D Plus only On the rear panel, set all the DIP switches to off downOptional Accessory Installation VoiceLift System Installation ProcedureVoiceLift System Included parts Optional Accessory Installation Priority Page Sensor Kit Priority Page Sensor Kit Included PartsTesting and Adjustment Procedure Configuration program for MLSPoleVault Switchers PVS, available at Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps