Extron electronic 305SA manual Extron Warranty

Page 51

Extron Warranty

Extron Electronics warrants this product against defects in materials and workmanship for a period of three years from the date of purchase. In the event of malfunction during the warranty period attributable directly to faulty workmanship and/or materials, Extron Electronics will, at its option, repair or replace said products or components, to whatever extent it shall deem necessary to restore said product to proper operating condition, provided that it is returned within the warranty period, with proof of purchase and description of malfunction to:

USA, Canada, South America,

 

and Central America:

Japan:

Extron Electronics

Extron Electronics, Japan

1230 South Lewis Street

Kyodo Building, 16 Ichibancho

Anaheim, CA 92805

Chiyoda-ku, Tokyo 102-0082

U.S.A.

Japan

Europe and Africa:

China:

Extron Europe

Extron China

Hanzeboulevard 10

686 Ronghua Road

3825 PH Amersfoort

Songjiang District

The Netherlands

Shanghai 201611

 

China

Asia:

Middle East:

Extron Asia Pty Ltd

Extron Middle East

135 Joo Seng Road, #04-01

Dubai Airport Free Zone

PM Industrial Bldg.

F12, PO Box 293666

Singapore 368363

United Arab Emirates, Dubai

Singapore

 

This Limited Warranty does not apply if the fault has been caused by misuse, improper handling care, electrical or mechanical abuse, abnormal operating conditions, or if modifications were made to the product that were not authorized by Extron.

NOTE: If a product is defective, please call Extron and ask for an Application Engineer to receive an RA (Return

Authorization) number. This will begin the repair process.

 

USA:

714.491.1500 or 800.633.9876

Europe:

31.33.453.4040

Asia:

65.6383.4400

Japan:

81.3.3511.7655

Units must be returned insured, with shipping charges prepaid. If not insured, you assume the risk of loss or damage during shipment. Returned units must include the serial number and a description of the problem, as well as the name of the person to contact in case there are any questions.

Extron Electronics makes no further warranties either expressed or implied with respect to the product and its quality, performance, merchantability, or fitness for any particular use. In no event will Extron Electronics be liable for direct, indirect, or consequential damages resulting from any defect in this product even if Extron Electronics has been advised of such damage.

Please note that laws vary from state to state and country to country, and that some provisions of this warranty may not apply to you.

Image 51
Contents PoleVault IP Systems Sicherheitsanweisungen Deutsch Safety InstructionsGuide on the Extron website FCC Class B NoticeVariables are written in slanted form as shown here Specifications AvailabilityConventions Used in this Guide Letter oPoleVault IP System OverviewPoleVault IP System Installation and Wiring Overview Typical Classroom Installation Before You Begin Planning the InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Included Items InventorySee rear cover for contact numbers KitsItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Place the PCM 340 on the T-bar Install Projector to Verify LocationMark Screen Location Mark the screen locationScrew the adjuster plate onto the base of the pipe Using the slots on the bracket that are Viii. Evenly balanced configurationClosest to the barrel on each arm, place Verify the Image Location Slide and lock the projector onto the adjuster plateTake the measurements with the PCM 340 on the T-frame Preliminary Safety Hardware InstallationMark the structural ceiling for lag eye bolt installation Cut the Ceiling TileFinish Projector Drop Ceiling Mount Installation Secure the Projector Drop Ceiling Mount to the Ceiling Attach the turnbuckles at the corners of the PCMHand tighten all four turnbuckles Install the Screen Install the Electrical Box if requiredShock or serious injury. For safety Install the Raco box and plaster ring onto the PCMPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates Cabling for the Wallplates and MediaLink Controller PVT transmitter installationMLC 104 IP Plus installation MLS 104 IP Plus MediaLink ControllerInstall the Mud Rings Features for MLC Mud Ring InstallationInsert the PVT mud ring into the wall Signal Cable Label color Provide strain reliefPull the cables at each location Install Wall Plates Connect the MLC 104 IP Plus to the switcher Install MediaLink ControllerTerminal RS-232 Cable color Pin Connect to the LAN using a CAT 5 cableTCP/IP Connections made to the MLC 104 IP PlusCabling for the Speakers Stage 3 Involves Installing the Devices Shown BelowSpeaker Installation FF 120 Flat Field Ceiling SpeakersInstall the Speaker on the Drop Ceiling Cut Ceiling TileMark and cut the tile Attach safety cable Stereo output Dual mono output Terminate the Speaker Cable for the PVS SwitcherWire the captive screw connector Stereo or dual mono output using parallel speaker wiringRear View PVS 305SA IP PoleVault SwitcherStage 4 Involves Installing the Devices Shown Below PMK 550 Pole Mount KitInstall the PMK 550 Base Plate Pull the Cables at the Switcher location Switcher and Projector Cable OverviewGather the cables, pass them down the pipe Your completed connections should look like the image below Finish installing the Pole Mount KitConfigure the Switcher MLS Switcher Configuration Program Stage 5 Involves Installing the Programs Shown BelowConfigurator Configure the System GlobalTest the System Check that an image is present, and adjust as neededAdjust the audio levels on the PVS 305SA IP Test the MLC configuration is correctFinal Installation Preset Switch setting Resolution Number Using Preset ModeAny changes to the Edid settings as needed When the image is correct, re-install the wallplateOn the rear panel, set all the DIP switches to off down Using Learn Mode Available on PVT RGB D Plus onlyOptional Accessory Installation VoiceLift System Installation ProcedureVoiceLift System Included parts Priority Page Sensor Kit Included Parts Optional Accessory Installation Priority Page Sensor KitTypical paging system with PVS 305SA IP switcher Configuration program for MLSPoleVault Switchers PVS, available at Testing and Adjustment ProcedureExtron Warranty Outline of Installation Steps