4.— Final Installation |
|
a. Slide the covers of the PMK 550 onto the base |
|
plate, ensuring the power cable can exit the unit |
|
through the power cable access slot. |
|
b. Using a 5/32 inch hex wrench, tighten down |
|
the four screws on the PMK 550 to secure the |
|
sides in place. |
|
c. Check and tighten the adjuster plate locking |
|
screws on the projector bracket. |
|
d. Hole plugs can be used to cover any exposed |
|
holes in the slotted pipe if necessary. | Ü Slide the covers onto the PMK 550. |
|
PoleVault IP Systems• Installation — Stage 5 (Configuration) | 41 |