Extron electronic 305SA manual Outline of Installation Steps

Page 52

Outline of Installation Steps

Stage 1 — Install the Screen and Projector

cMark the screen location (page 12).

cInstall projector to verify location (page 12).

cVerify the image location (page 15).

cCut the ceiling tile (page 16).

cPreliminary safety hardware installation (page 16).

cFinish projector drop ceiling mount installation (page 17).

cSecure the projector drop ceiling mount to the ceiling (page 18).

cInstall the electrical box (if required) (page 19).

cInstall the screen (page 19).

Stage 2 — Mount the PVT Wall Plates and the MLC 104 IP Plus.

cInstall the mud rings (page 23).

cPull cables (at the input locations) (page 24).

cInstall the wall plates (page 25).

cInstall the MediaLink Controller (page 26).

Stage 3 — Install the FF 120 Speakers.

cCut the ceiling tile (page 30).

cInstall the speaker on the drop ceiling (page 30).

cTerminate the speaker cable for the PVS switcher (page 32). Stage 4 — Install the PMK 550 and the PVS 305SA IP.

cInstall the PMK 550 base plate (page 34).

cPull the cables (at the switcher location) (page 35).

cFinish installing the pole mount kit (page 36).

Stage 5 — Configure the PoleVault Switcher and the System.

cConfigure the switcher — MLS Switcher Configuration program (page 37).

cConfigure the system — Global Configurator (page 38).

cTest the system (page 39).

cFinal installation (page 41).

Extron Headquarters

 

Extron Europe

Extron Asia

Extron Japan

Extron China

Extron Middle East

Extron Korea

Extron India

+1.800.633.9876 (Inside USA/Canada Only)

+800.3987.6673

+65.6383.4400

+81.3.3511.7655

+86.21.3760.1568

+971.4.299.1800

+82.2.3444.1571

1800.3070.3777

Extron USA - West

Extron USA - East

(Inside Europe Only)

+65.6383.4664 FAX

+81.3.3511.7656 FAX

+86.21.3760.1566 FAX

+971.4.299.1880 FAX

+82.2.3444.1575 FAX

(Inside India Only)

+1.714.491.1500

+1.919.850.1000

+31.33.453.4040

 

 

 

 

 

+91.80.3055.3777

+1.714.491.1517 FAX

+1.919.850.1001 FAX

+31.33.453.4050 FAX

 

 

 

 

 

+91.80.3055.3737 FAX

 

 

 

 

 

 

 

 

 

© 2013 Extron Electronics All rights reserved. www.extron.com

Image 52
Contents PoleVault IP Systems Safety Instructions Sicherheitsanweisungen DeutschFCC Class B Notice Guide on the Extron websiteSpecifications Availability Conventions Used in this GuideLetter o Variables are written in slanted form as shown hereOverview PoleVault IP SystemPoleVault IP System Installation and Wiring Overview Before You Begin Planning the Installation Typical Classroom InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Inventory Included ItemsKits See rear cover for contact numbersItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Install Projector to Verify Location Mark Screen LocationMark the screen location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Viii. Evenly balanced configuration Using the slots on the bracket that areClosest to the barrel on each arm, place Slide and lock the projector onto the adjuster plate Verify the Image LocationPreliminary Safety Hardware Installation Mark the structural ceiling for lag eye bolt installationCut the Ceiling Tile Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Attach the turnbuckles at the corners of the PCM Secure the Projector Drop Ceiling Mount to the CeilingHand tighten all four turnbuckles Install the Electrical Box if required Shock or serious injury. For safetyInstall the Raco box and plaster ring onto the PCM Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates PVT transmitter installation MLC 104 IP Plus installationMLS 104 IP Plus MediaLink Controller Cabling for the Wallplates and MediaLink ControllerFeatures for MLC Mud Ring Installation Install the Mud RingsInsert the PVT mud ring into the wall Provide strain relief Signal Cable Label colorPull the cables at each location Install Wall Plates Install MediaLink Controller Connect the MLC 104 IP Plus to the switcherConnect to the LAN using a CAT 5 cable Terminal RS-232 Cable color PinConnections made to the MLC 104 IP Plus TCP/IPStage 3 Involves Installing the Devices Shown Below Speaker InstallationFF 120 Flat Field Ceiling Speakers Cabling for the SpeakersCut Ceiling Tile Install the Speaker on the Drop CeilingMark and cut the tile Attach safety cable Terminate the Speaker Cable for the PVS Switcher Wire the captive screw connectorStereo or dual mono output using parallel speaker wiring Stereo output Dual mono outputPVS 305SA IP PoleVault Switcher Stage 4 Involves Installing the Devices Shown BelowPMK 550 Pole Mount Kit Rear ViewInstall the PMK 550 Base Plate Switcher and Projector Cable Overview Pull the Cables at the Switcher locationGather the cables, pass them down the pipe Finish installing the Pole Mount Kit Your completed connections should look like the image belowStage 5 Involves Installing the Programs Shown Below Configure the Switcher MLS Switcher Configuration ProgramConfigure the System Global ConfiguratorCheck that an image is present, and adjust as needed Test the SystemTest the MLC configuration is correct Adjust the audio levels on the PVS 305SA IPFinal Installation Using Preset Mode Any changes to the Edid settings as neededWhen the image is correct, re-install the wallplate Preset Switch setting Resolution NumberUsing Learn Mode Available on PVT RGB D Plus only On the rear panel, set all the DIP switches to off downInstallation Procedure Optional Accessory Installation VoiceLift SystemVoiceLift System Included parts Optional Accessory Installation Priority Page Sensor Kit Priority Page Sensor Kit Included PartsConfiguration program for MLS PoleVault Switchers PVS, available atTesting and Adjustment Procedure Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps