Extron electronic 305SA manual Outline of Installation Steps

Page 14

Outline of Installation Steps

Stage 1 — Install the Screen and Projector

cMark the screen location (page 12).

cInstall projector to verify location (page 12).

cVerify the image location (page 15).

cCut the ceiling tile (page 16).

cPreliminary safety hardware installation (page 16).

cFinish projector drop ceiling mount installation (page 17).

cSecure the projector drop ceiling mount to the ceiling (page 18).

cInstall the electrical box (if required) (page 19).

cInstall the screen (page 19).

Stage 2 — Mount the PVT Wall Plates and the MLC 104 IP Plus.

cInstall the mud rings (page 23).

cPull cables (at the input locations) (page 24).

cInstall the wall plates (page 25).

cInstall the MediaLink Controller (page 26).

Stage 3 — Install the FF 120 Speakers.

cCut the ceiling tile (page 30).

cInstall the speaker on the drop ceiling (page 30).

cTerminate the speaker cable for the PVS switcher (page 32).

Stage 4 — Install the PMK 550 and the PVS 305SA IP.

cInstall the PMK 550 base plate (page 34).

cPull the cables (at the switcher location) (page 35).

cFinish installing the pole mount kit (page 36).

Stage 5 — Configure the PoleVault Switcher and the System.

cConfigure the switcher — MLS Switcher Configuration program (page 37).

cConfigure the system — Global Configurator (page 38).

cTest the system (page 39).

cFinal installation (page 41).

The following pages contain instructions for installing the PoleVault IP System. Where possible, line drawings and photos from an actual installation are used to clarify some of the steps discussed in the text. Most images have a number corresponding to the step that is being described (for example, Ñ).

10PoleVault IP Systems • Installation Overview

Image 14
Contents PoleVault IP Systems Safety Instructions Sicherheitsanweisungen DeutschFCC Class B Notice Guide on the Extron websiteLetter o Specifications AvailabilityConventions Used in this Guide Variables are written in slanted form as shown hereOverview PoleVault IP SystemPoleVault IP System Installation and Wiring Overview Before You Begin Planning the Installation Typical Classroom InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Inventory Included ItemsKits See rear cover for contact numbersItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Mark the screen location Install Projector to Verify LocationMark Screen Location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Closest to the barrel on each arm, place Using the slots on the bracket that areViii. Evenly balanced configuration Slide and lock the projector onto the adjuster plate Verify the Image LocationCut the Ceiling Tile Preliminary Safety Hardware InstallationMark the structural ceiling for lag eye bolt installation Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Hand tighten all four turnbuckles Secure the Projector Drop Ceiling Mount to the CeilingAttach the turnbuckles at the corners of the PCM Install the Raco box and plaster ring onto the PCM Install the Electrical Box if requiredShock or serious injury. For safety Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates MLS 104 IP Plus MediaLink Controller PVT transmitter installationMLC 104 IP Plus installation Cabling for the Wallplates and MediaLink ControllerInsert the PVT mud ring into the wall Install the Mud RingsFeatures for MLC Mud Ring Installation Pull the cables at each location Signal Cable Label colorProvide strain relief Install Wall Plates Install MediaLink Controller Connect the MLC 104 IP Plus to the switcherConnect to the LAN using a CAT 5 cable Terminal RS-232 Cable color PinConnections made to the MLC 104 IP Plus TCP/IPFF 120 Flat Field Ceiling Speakers Stage 3 Involves Installing the Devices Shown BelowSpeaker Installation Cabling for the SpeakersMark and cut the tile Install the Speaker on the Drop CeilingCut Ceiling Tile Attach safety cable Stereo or dual mono output using parallel speaker wiring Terminate the Speaker Cable for the PVS SwitcherWire the captive screw connector Stereo output Dual mono outputPMK 550 Pole Mount Kit PVS 305SA IP PoleVault SwitcherStage 4 Involves Installing the Devices Shown Below Rear ViewInstall the PMK 550 Base Plate Gather the cables, pass them down the pipe Pull the Cables at the Switcher locationSwitcher and Projector Cable Overview Finish installing the Pole Mount Kit Your completed connections should look like the image belowStage 5 Involves Installing the Programs Shown Below Configure the Switcher MLS Switcher Configuration ProgramConfigure the System Global ConfiguratorCheck that an image is present, and adjust as needed Test the SystemTest the MLC configuration is correct Adjust the audio levels on the PVS 305SA IPFinal Installation When the image is correct, re-install the wallplate Using Preset ModeAny changes to the Edid settings as needed Preset Switch setting Resolution NumberUsing Learn Mode Available on PVT RGB D Plus only On the rear panel, set all the DIP switches to off downVoiceLift System Included parts Optional Accessory Installation VoiceLift SystemInstallation Procedure Optional Accessory Installation Priority Page Sensor Kit Priority Page Sensor Kit Included PartsTesting and Adjustment Procedure Configuration program for MLSPoleVault Switchers PVS, available at Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps