Outline of Installation Steps
Stage 1 — Install the Screen and Projector
cMark the screen location (page 12).
cInstall projector to verify location (page 12).
cVerify the image location (page 15).
cCut the ceiling tile (page 16).
cPreliminary safety hardware installation (page 16).
cFinish projector drop ceiling mount installation (page 17).
cSecure the projector drop ceiling mount to the ceiling (page 18).
cInstall the electrical box (if required) (page 19).
cInstall the screen (page 19).
Stage 2 — Mount the PVT Wall Plates and the MLC 104 IP Plus.
cInstall the mud rings (page 23).
cPull cables (at the input locations) (page 24).
cInstall the wall plates (page 25).
cInstall the MediaLink Controller (page 26).
Stage 3 — Install the FF 120 Speakers.
cCut the ceiling tile (page 30).
cInstall the speaker on the drop ceiling (page 30).
cTerminate the speaker cable for the PVS switcher (page 32).
Stage 4 — Install the PMK 550 and the PVS 305SA IP.
cInstall the PMK 550 base plate (page 34).
cPull the cables (at the switcher location) (page 35).
cFinish installing the pole mount kit (page 36).
Stage 5 — Configure the PoleVault Switcher and the System.
cConfigure the switcher — MLS Switcher Configuration program (page 37).
cConfigure the system — Global Configurator (page 38).
cTest the system (page 39).
cFinal installation (page 41).
The following pages contain instructions for installing the PoleVault IP System. Where possible, line drawings and photos from an actual installation are used to clarify some of the steps discussed in the text. Most images have a number corresponding to the step that is being described (for example, Ñ).
10PoleVault IP Systems • Installation Overview