Extron electronic 305SA manual Connections made to the MLC 104 IP Plus, Tcp/Ip

Page 32

d.The connections between the MLC 104 IP Plus and the PVS 305SA IP switcher should look like the figure at right.

TCP/IP

Network

N15779

1A RGB

2A RGB

3A RGB

4A RGB

 

 

 

LINE OUT

AMPLIFIED AUDIO OUT

LAN 3

LAN 4

 

 

 

 

DO NOT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GROUND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OR SHORT

 

 

 

2/4/8

 

 

I

 

 

 

 

OUTPUTS

VOICELIFT

 

 

SPEAKER

 

 

 

Ohms

 

POWER

N

 

 

 

 

VIDEO

L

R

OUTPUTS

 

 

 

 

 

 

 

 

RGB

RECEIVER

CLASS 2 WIRING

L

R

 

 

 

P

 

 

 

 

 

 

 

 

 

U

 

 

 

 

 

 

L

R

10V

50mA

CONTROL

 

 

T

 

 

 

 

 

 

 

 

 

 

 

Tx Rx IR

12V

 

 

S

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12V

 

1B RGB

2B RGB

3B RGB

4B RGB

 

AUX AUDIO

 

PAGING

 

RS-232 MLC/IR

 

 

5A MAX

 

 

/VIDEO

/VIDEO

 

INPUT 5

 

SENSOR VOL/MUTE

 

LAN 1

LAN 2

PVS 305SA IP Switcher Rear Panel

4c

 

 

4a

 

 

CAT 5 Cable

 

RS-232

 

 

 

and Power

 

 

 

 

 

 

 

 

LAN

PRESS TAB WITH

 

4b RS-232 Control

TWEEKER TO REMOVE

 

 

 

 

 

 

 

Tx Rx GROUND OUTIR

OUT+12V GROUND CM IRIN SCP

1 2 3 GROUND

Rx

Tx

GROUND

GROUND +12VIN

 

 

 

A

B

 

 

DISPLAY

A B C D E

DIGITAL

MLS

 

POWER

RS-232/IR

COMM LINK

I/O

RS-232

12V

Projector

 

 

 

 

 

 

MLC 104 IP Plus Right Side Panel

ÒConnections made to the MLC 104 IP Plus

e.Sliding the cables into the opening, secure the MLC 104 IP Plus to the mud ring with the provided machine screws.

 

Wall

 

 

 

4.06"

Rotate locking arm

 

 

and insert into wall

 

 

 

 

 

 

opening.

 

 

 

3.75"

 

 

 

 

Wall Mouting

 

 

 

 

Bracket

 

OFF

 

 

ON

OFF

 

 

 

 

ON

 

 

 

 

 

1

 

 

 

 

2

 

 

 

 

3

 

 

 

VOLUME

4

 

 

 

 

 

 

 

 

CONFIG

 

 

 

 

IP

Plus

 

Extron

 

104

 

 

 

MLC

 

 

 

 

 

 

MLC 104 IP Plus

 

 

Ô Secure the MLC 104 IP Plus to the mud ring

28PoleVault IP Systems • Installation — Stage 2 (Wallplates and MLC)

Image 32
Contents PoleVault IP Systems Safety Instructions Sicherheitsanweisungen DeutschFCC Class B Notice Guide on the Extron websiteSpecifications Availability Conventions Used in this GuideLetter o Variables are written in slanted form as shown hereOverview PoleVault IP SystemPoleVault IP System Installation and Wiring Overview Before You Begin Planning the Installation Typical Classroom InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Inventory Included ItemsKits See rear cover for contact numbersItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Install Projector to Verify Location Mark Screen LocationMark the screen location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Closest to the barrel on each arm, place Using the slots on the bracket that areViii. Evenly balanced configuration Slide and lock the projector onto the adjuster plate Verify the Image LocationPreliminary Safety Hardware Installation Mark the structural ceiling for lag eye bolt installationCut the Ceiling Tile Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Hand tighten all four turnbuckles Secure the Projector Drop Ceiling Mount to the CeilingAttach the turnbuckles at the corners of the PCM Install the Electrical Box if required Shock or serious injury. For safetyInstall the Raco box and plaster ring onto the PCM Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates PVT transmitter installation MLC 104 IP Plus installationMLS 104 IP Plus MediaLink Controller Cabling for the Wallplates and MediaLink ControllerInsert the PVT mud ring into the wall Install the Mud RingsFeatures for MLC Mud Ring Installation Pull the cables at each location Signal Cable Label colorProvide strain relief Install Wall Plates Install MediaLink Controller Connect the MLC 104 IP Plus to the switcherConnect to the LAN using a CAT 5 cable Terminal RS-232 Cable color PinConnections made to the MLC 104 IP Plus TCP/IPStage 3 Involves Installing the Devices Shown Below Speaker InstallationFF 120 Flat Field Ceiling Speakers Cabling for the SpeakersMark and cut the tile Install the Speaker on the Drop CeilingCut Ceiling Tile Attach safety cable Terminate the Speaker Cable for the PVS Switcher Wire the captive screw connectorStereo or dual mono output using parallel speaker wiring Stereo output Dual mono outputPVS 305SA IP PoleVault Switcher Stage 4 Involves Installing the Devices Shown BelowPMK 550 Pole Mount Kit Rear ViewInstall the PMK 550 Base Plate Gather the cables, pass them down the pipe Pull the Cables at the Switcher locationSwitcher and Projector Cable Overview Finish installing the Pole Mount Kit Your completed connections should look like the image belowStage 5 Involves Installing the Programs Shown Below Configure the Switcher MLS Switcher Configuration ProgramConfigure the System Global ConfiguratorCheck that an image is present, and adjust as needed Test the SystemTest the MLC configuration is correct Adjust the audio levels on the PVS 305SA IPFinal Installation Using Preset Mode Any changes to the Edid settings as neededWhen the image is correct, re-install the wallplate Preset Switch setting Resolution NumberUsing Learn Mode Available on PVT RGB D Plus only On the rear panel, set all the DIP switches to off downVoiceLift System Included parts Optional Accessory Installation VoiceLift SystemInstallation Procedure Optional Accessory Installation Priority Page Sensor Kit Priority Page Sensor Kit Included PartsConfiguration program for MLS PoleVault Switchers PVS, available atTesting and Adjustment Procedure Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps