6.— Finish Projector Drop Ceiling Mount Installation
a.Detach the projector bracket and projector from the adjuster plate. DO NOT remove the projector bracket from the projector.
b.Unscrew the adjuster plate from the mounting pole.
c.Loosen the set screws on the PCM 340 and the pipe location screw and remove the mounting pole, then loosen the
d.Replace the cut ceiling tile, checking the orientation to align the hole with the PCM 340.
e.Replace the PCM 340 over the ceiling tile, slide the slotted pipe up through the tile and into the adapter plate. Realign the location holes with the pipe holes, insert and tighten down the location screw. Tighten the set screws.
f.Tighten the four
J Slide the pipe up through the ceiling tile and into the pipe adapter plate. Shown as viewed from below.
PoleVault IP Systems • Installation — Stage 1 (Screen and Projector) | 17 |