Extron electronic 305SA manual Items Not Included

Page 12

Items Not Included

The following items are not included. However, input and display devices are essential parts of the system, and at any installation they may vary depending on their use. This list suggests various devices that may be used.

Projector (or display device)

Screen (and mounting hardware)

Input devices, such as:

BluRay, DVD/CD/VCR combo player (and cables)

Document camera (and cables)

PC or Mac computer (with keyboard, mouse, local monitor, VGA cables, RJ-

45 network cables, power cords, and, where desired, a P/2 DA2 or Distribution Amplifier (DA) for PC signal to local monitor)

Installation hardware needed (may vary per installation):

Bolts for concrete structural ceilings where needed Toggles (used for screen mounting on dry wall) S-hooks for hanging the screen

Spare ceiling tiles in case of accidental damage during installation Electrical box, where installation of a box on the PCM 340 is desired

Safety wire, lag eye bolts, and strain reliefs for installation and securing ceiling speakers

Heat shrink, extension cord

Installation Tools

To aid the professional installer, this checklist gives the tools recommended to complete the installation. Tools should include, but are not confined to:

Laser level, or two levels (large for screen installation, small for wall plates and projector mounts)

Tape measure

Stud finder

Drill and drill bit set including a Unibit to cut through metal studs

Extension drill bit (3/4 inch min., 4 to 8 foot length, to drill through fire-breaks)

Socket set

Pipe strap or wrapped pipe wrench

Pliers and wire strippers

Standard screwdriver set and Extron Tweeker

Cable cutters (to cut safety wire)

Dry wall saw and hacksaw blade mounted on handle (for cutting ceiling tiles)

Flashlight and safety goggles

Razor knife

2 inch hole saw

Painter’s tape (to mark up walls), pencil, and marker pen

RJ-45 crimpers and RJ-45 connectors

Voltage tester

Fish tape, pull string, and electrical tape (for taping fish tape to pull string)

Zip ties

Vacuum cleaner

Heat gun

8PoleVault IP Systems • Introduction

Image 12
Contents PoleVault IP Systems Safety Instructions Sicherheitsanweisungen DeutschFCC Class B Notice Guide on the Extron websiteSpecifications Availability Conventions Used in this GuideLetter o Variables are written in slanted form as shown hereOverview PoleVault IP SystemPoleVault IP System Installation and Wiring Overview Before You Begin Planning the Installation Typical Classroom InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Inventory Included ItemsKits See rear cover for contact numbersItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Install Projector to Verify Location Mark Screen LocationMark the screen location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Using the slots on the bracket that are Viii. Evenly balanced configurationClosest to the barrel on each arm, place Slide and lock the projector onto the adjuster plate Verify the Image LocationPreliminary Safety Hardware Installation Mark the structural ceiling for lag eye bolt installationCut the Ceiling Tile Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Secure the Projector Drop Ceiling Mount to the Ceiling Attach the turnbuckles at the corners of the PCMHand tighten all four turnbuckles Install the Electrical Box if required Shock or serious injury. For safetyInstall the Raco box and plaster ring onto the PCM Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates PVT transmitter installation MLC 104 IP Plus installationMLS 104 IP Plus MediaLink Controller Cabling for the Wallplates and MediaLink ControllerInstall the Mud Rings Features for MLC Mud Ring InstallationInsert the PVT mud ring into the wall Signal Cable Label color Provide strain reliefPull the cables at each location Install Wall Plates Install MediaLink Controller Connect the MLC 104 IP Plus to the switcherConnect to the LAN using a CAT 5 cable Terminal RS-232 Cable color PinConnections made to the MLC 104 IP Plus TCP/IPStage 3 Involves Installing the Devices Shown Below Speaker InstallationFF 120 Flat Field Ceiling Speakers Cabling for the SpeakersInstall the Speaker on the Drop Ceiling Cut Ceiling TileMark and cut the tile Attach safety cable Terminate the Speaker Cable for the PVS Switcher Wire the captive screw connectorStereo or dual mono output using parallel speaker wiring Stereo output Dual mono outputPVS 305SA IP PoleVault Switcher Stage 4 Involves Installing the Devices Shown BelowPMK 550 Pole Mount Kit Rear ViewInstall the PMK 550 Base Plate Pull the Cables at the Switcher location Switcher and Projector Cable OverviewGather the cables, pass them down the pipe Finish installing the Pole Mount Kit Your completed connections should look like the image belowStage 5 Involves Installing the Programs Shown Below Configure the Switcher MLS Switcher Configuration ProgramConfigure the System Global ConfiguratorCheck that an image is present, and adjust as needed Test the SystemTest the MLC configuration is correct Adjust the audio levels on the PVS 305SA IPFinal Installation Using Preset Mode Any changes to the Edid settings as neededWhen the image is correct, re-install the wallplate Preset Switch setting Resolution NumberUsing Learn Mode Available on PVT RGB D Plus only On the rear panel, set all the DIP switches to off downOptional Accessory Installation VoiceLift System Installation ProcedureVoiceLift System Included parts Optional Accessory Installation Priority Page Sensor Kit Priority Page Sensor Kit Included PartsConfiguration program for MLS PoleVault Switchers PVS, available atTesting and Adjustment Procedure Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps