Extron electronic 305SA manual Pull the Cables at the Switcher location

Page 39

2. — Pull the Cables (at the Switcher location)

a.Gather all the cables from the speakers, AV wall plates, MLC 104 IP Plus controller, and any installed optional devices that have been run to the switcher location. Pull them down through the ceiling hole and the pipe.

These cables are:

the MLC power/RS-232 cable

the CAT 5 input cables from the wall plates

the speaker cables

the MLC to projector (IR/RS-232 projector control) cable

any optional device cables (Aux audio input Priority Page Sensor Kit, VoiceLift.)

Ethernet cable

b.Pull the cables out of the pipe slot towards the switcher, ready for connection. Leave the IR/RS-232 projector control cable to hang out of the bottom of the pipe.

c.Connect the output video signal cables (VGA and RCA) to the switcher and pull the loose ends down the pipe so that they hang out the pipe with the IR/RS-232 projector control cable, to be connected to the projector later.

NOTE: Do not thread any high voltage

power cabling, such as power supply

or projector power cords, through the

projector pipe. This violates National

Electrical Code.

ÉGather the cables, pass them down the pipe.

Cables to PVS 305SA IP

1A/V wall plate cables, CAT 5

2MLC 104 IP Plus switcher control cable

3FF 120 speaker cables

7LAN pass-through cables

1

1

1

4

2

3

3

7

 

 

 

 

 

 

 

 

 

 

 

Optional accessory cables from

 

 

 

 

 

the VoiceLift and Page Sensor,

 

 

 

 

 

may also be included.

 

 

 

 

1

 

 

 

 

1

 

 

 

Power

 

 

 

 

 

Supply

 

 

 

 

 

 

7

6

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

2

5

 

PoleVault

Switcher

Projector

Pole

Cable Access

Slot

 

Cables to Projector

 

4 IR/RS-232 projector control cable

 

5

VGA cable

4 5 6

6

Video RCA cable

To Projector

Switcher and Projector Cable Overview

PoleVault IP Systems • Installation — Stage 4 (PMK 550 and PVS 305SA IP)

35

Image 39
Contents PoleVault IP Systems Sicherheitsanweisungen Deutsch Safety InstructionsGuide on the Extron website FCC Class B NoticeVariables are written in slanted form as shown here Specifications AvailabilityConventions Used in this Guide Letter oPoleVault IP System OverviewPoleVault IP System Installation and Wiring Overview Typical Classroom Installation Before You Begin Planning the InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Included Items InventorySee rear cover for contact numbers KitsItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Place the PCM 340 on the T-bar Install Projector to Verify LocationMark Screen Location Mark the screen locationScrew the adjuster plate onto the base of the pipe Using the slots on the bracket that are Viii. Evenly balanced configurationClosest to the barrel on each arm, place Verify the Image Location Slide and lock the projector onto the adjuster plateTake the measurements with the PCM 340 on the T-frame Preliminary Safety Hardware InstallationMark the structural ceiling for lag eye bolt installation Cut the Ceiling TileFinish Projector Drop Ceiling Mount Installation Secure the Projector Drop Ceiling Mount to the Ceiling Attach the turnbuckles at the corners of the PCMHand tighten all four turnbuckles Install the Screen Install the Electrical Box if requiredShock or serious injury. For safety Install the Raco box and plaster ring onto the PCMPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates Cabling for the Wallplates and MediaLink Controller PVT transmitter installationMLC 104 IP Plus installation MLS 104 IP Plus MediaLink ControllerInstall the Mud Rings Features for MLC Mud Ring InstallationInsert the PVT mud ring into the wall Signal Cable Label color Provide strain reliefPull the cables at each location Install Wall Plates Connect the MLC 104 IP Plus to the switcher Install MediaLink ControllerTerminal RS-232 Cable color Pin Connect to the LAN using a CAT 5 cableTCP/IP Connections made to the MLC 104 IP PlusCabling for the Speakers Stage 3 Involves Installing the Devices Shown BelowSpeaker Installation FF 120 Flat Field Ceiling SpeakersInstall the Speaker on the Drop Ceiling Cut Ceiling TileMark and cut the tile Attach safety cable Stereo output Dual mono output Terminate the Speaker Cable for the PVS SwitcherWire the captive screw connector Stereo or dual mono output using parallel speaker wiringRear View PVS 305SA IP PoleVault SwitcherStage 4 Involves Installing the Devices Shown Below PMK 550 Pole Mount KitInstall the PMK 550 Base Plate Pull the Cables at the Switcher location Switcher and Projector Cable OverviewGather the cables, pass them down the pipe Your completed connections should look like the image below Finish installing the Pole Mount KitConfigure the Switcher MLS Switcher Configuration Program Stage 5 Involves Installing the Programs Shown BelowConfigurator Configure the System GlobalTest the System Check that an image is present, and adjust as neededAdjust the audio levels on the PVS 305SA IP Test the MLC configuration is correctFinal Installation Preset Switch setting Resolution Number Using Preset ModeAny changes to the Edid settings as needed When the image is correct, re-install the wallplateOn the rear panel, set all the DIP switches to off down Using Learn Mode Available on PVT RGB D Plus onlyOptional Accessory Installation VoiceLift System Installation ProcedureVoiceLift System Included parts Priority Page Sensor Kit Included Parts Optional Accessory Installation Priority Page Sensor KitTypical paging system with PVS 305SA IP switcher Configuration program for MLSPoleVault Switchers PVS, available at Testing and Adjustment ProcedureExtron Warranty Outline of Installation Steps